Freelance German Translators : Rochester, New York

Category
Skill
Country
Region
City
Keyword

For Freelancers

  • Create an awesome portfolio to showcase your talent.
  • Rub elbows with the web's most talented freelancers.
  • Earn money doing what you love to do.
  • And much more...

For Employers

  • Post your freelance job in just 30 seconds. It's free!
  • Instant access to the web's most talented freelancers.
  • Hire an unlimited number of freelancers.
  • And much more...
 Freelancers 
 Portfolios 
 

Search Results

  Portfolios   Sort
Julie2012 - Freelance German Translation & Biography Writing
0
Kudos
3.0
2 Skills
Ask
Rate/Hr
Description not provided
Rochester, New York, United States

More Freelancers

Valembrun Valery - Freelance Fashion Illustration & Portrait Painting
0
Kudos
4.5
2 Skills
$10
Rate/Hr
Hello , my name is Valembrun Valery , speaks three languages such as French,Creole, English, i've won an award for best designer and jewelry maker, i'm an women's clothing and accessory designer, painter , i was on the MOCA's magazine, they published my work and also was on there billboard.
Miami, Florida, United States
Traci M. Schuler - Freelance Article Writing & Book Writing
0
Kudos
3.0
2 Skills
Ask
Rate/Hr
I Am Currently Working As A Publishing Manager, Life-Coach And Counselor. I am a Published Author through The Library Of Congress. I am The CEO and Founder Of "Schuler Writing Services". I'm Featured in Sain-City Magazine 2014 Edition And Currently Have A Memoir Scheduled For Release In the Middle Of 2014. I have a Bachelor's of Science Degree in Liberal Arts With A Concentration in Sociology and A Background In Law.
Bonita Springs, Florida, United States
Ibrar Kaif - Freelance Screenwriting & Fashion Photography
0
Kudos
3.0
2 Skills
$7
Rate/Hr
•••••••••••••••••••••••••••••• SUMMARY: Highly creative and self-motivated Creative Writer with great background creating original written works, such as plays or prose, for publication and performance. A highly motivated person who want to use his God gifted talent of creativity for the betterment of the humanity, very interested stories & Screenplays on original social issues i.e. Poverty, Terrorism, Education, Child labor, Unethical business/social practices, and Love. PERSONAL PROFILE IBRAR KAIF Nationality: Pakistani Address: 166 C-2, Johar town-Lahore Email: ibrkaif@gmail.com Mob: 0334-7271202 ? Very creative to write any kind of stories ,documentaries, dramas, Screenplays and can think out of the box ? Knowledge of editing equipment and a willingness to keep up with changes in that technology ? Ability to work alone on detailed and sometimes tedious work ? Problem-solving skills to make film sequences work well or to work with the available footage ? Strong interpersonal skills to work well with directors, cinematographers, sound editors, special effects editors and music producers ? Flexibility to deal with production delays, unexpected problems and varied personality types ? Ability to remain calm and confident in high-stress or crisis situations ? A commitment to high-quality work and to continuing to improve your own skills and knowledge ? Summary of Qualifications ? Strong researching and reporting skills. ? Uncommon talent to envision and craft unique and memorable brand Stories. ? Superior command of English language. ? Possess exceptional eye for detail. ? Remarkable command of MS Word, and MS Office. ? excellent time-management and prioritization skills. ? Strong communication skills. ? profound ability to perform gracefully under pressure and meet deadlines. ? Strong willingness to be flexible to project needs. ? Remarkable ability to perform as part of a team as well as individually. ? immense desire to mentor and develop editorial skills of content Producers. ? Great enthusiasm for Web trends. ? Possess positive, proactive, solution-oriented approach to problems Professional Experience Creative Writer ? Conduct research to obtain factual information and authentic detail, utilizing sources such as newspaper accounts, diaries, and interviews. ? Review, submit for approval, and revise written material to meet personal standards and satisfy needs of client, publisher, director, or producer. ? Select subject or theme for writing project based on personal interest and writing specialty, or assignment from publisher, client, producer, or director. ? Develop factors, such as theme, plot, characterization, psychological analysis, historical environment, action, and dialogue, to create material. ? Write humorous material for publication or performance, such as comedy routines, gags, comedy shows, or scripts for entertainers. ? Write fiction or nonfiction prose work, such as short story, novel, biography, article, descriptive or critical analysis, or essay. Writes play or script for moving pictures or television, based on original ideas or adapted from fictional, historical, or narrative sources. ? Organize material for project, plans arrangement or outline, and write synopsis. ? Collaborate with other writers on specific projects. Skills ? Screen Writing ? Creative Director ? Communication skill ? Interpersonal Skills ? MS Office ? Spss ? Adobe movie maker ? Photography ? Adobe Photoshop Education University of Management and Technology (UMT), Lahore BBA-H 2016
United States
Frank Olivier - Freelance Drafting & CAD
0
Kudos
5.0
2 Skills
$45
Rate/Hr
nr Mechanical, Structural Designer - Project Coordinator - Project Engineer • Professional offering over 24 years of experience ranging from Project Coordination to Design in Process Plants, Industrial Buildings and Mining • My Golden rule: To take the Imposable and meet the Project Design requirements keep it with in Schedule of the Process Plant Life Span, bring the Project Under Budget and meet all projects meets all OHS requirements. • On Site and Office Environment experience, working on Multi project and workloads and Proven ability to Cope with High Volume of Pressure. • Project Management and Proven skills in Result-Driven and Motivation and Team Leadership, with strong and Decisive Operations Leadership, Loyal and Professional, Ethical, Honest Excellent in Deceive Decision Making, Honest and Dependable. • Time Management, Planning and Scheduling of Workloads, Strong Communication and High Level of Problem Solving, Technical skills and Report Scope of works writing and Able to take on New Challenges. • A committed Team player, able to work as a Team member or on my own initiative with Minimum Supervision in a Office, Workshop Fabrication and Site Construction. • Pro-active, goal oriented with excellent attention to detail. Positive Attitude towards my Fellow works, Team focused, Problem Solving, Results and Objective Driven. • Commented to Organisation Providing Quality Service to Internal and External Clients and ongoing Personal skill and Development Training Program. • Drawing on my past Experance to Meet all Requirements to meet Technical Managemet and Drawing Office Procedures, the use of Project Standards and all required AS/NZ code for each discipline • Excellent customer focus and able to consistently meet client’s needs. • Effectively manages change to work tasks and the work environment, and assists others with adapting to change. • Able to identify issues, problems and opportunities; make timely decisions; develop appropriate and innovative solutions; and ask for assistance if required. • Excellent verbal and written communications skills, including the ability to convey information and ideas to individuals and groups, and make presentations when required. • Demonstrate initiative and a willingness to learn and continuously improve on performance. • Able to work effectively in small to large multi-disciplinary teams, and share and transfer knowledge within teams. • Creating work packs for large and small bore pipe; i.e. pipe supports, piping routes and required material take offs onsite or located in main office. The use of 3D models and P & ID’s and mechanical and structural steel layouts to complete a work packs. All piping routs are laid out to meet safe installation and keep cost down. Includes pipe spool length for safe installation. » Education Diploma of Business (Front Line Management) Associate Diploma in Civil Engineering Process Piping Design » Skills Applications Microsoft Project Professional Release 2013 Microsoft Office Professional all relevant software Microsoft Office SQL Server 2000 Database AutoCAD Release: Dos 12 to Win 2015 AutoCAD Advance Steel 2015 Autodesk MEP 2015 AutoCAD Revit Structure 2014 & 2015 AutoCAD Revit MEP 2014 & 2015 AutoCAD Navisworks 2009 to 2015 Auto plant 3D Piping series 5 & 6 Pro Cad Piping 2D /3D Smart 2010 Bentley Pro-Steel v8i select series 6 Bentley Auto Plant P & ID Auto Turn Release: 6.0 Micro Station v8i Bentley OpenPlant Modeler V8i » Work Experience Brightwater Engineering (Perth) Snr Mechanical Designer AutoCAD 2015, Navisworks Manage 2015 August 2014 - September 2014 Yarraville Slage Grinding Mill Project Contracted to bring the Project in Under Schedule and Under Cost with Good Engineering practice, 3D Design using AutoCAD and Navisworks to complete Design Reviews and Clash Detection. The design composed three sag mill feed chute feeding one conveyor. Two of the chute require chute to capture any steel fragments which will be picked up by two magnets. These to chute require to be directed away from the head chute to the recycle bins located on the floor level. Complete some miner back drafting 3D model was used to design check for clash detection and cut sections and elevation for detailing. All three chute composed of the same head chute and each discharge chute were design to meet the material flow rate on to the conveyor at a 9 degree angle. With Good Engineering practice and 3D design and Clash Detection the time spent kept the Project ahead of schedule. August 2013 - August 2014 Home renovations using AutoCAD and Navisworks software to complete a 3D models to complete design tiling, BBQ area and decking frame and decking boards, brick and carpentry work. Installation of two 5000l and 1100 l of rain water tanks and single water pump, which included the reticulation P & ID and piping layout including transfer pipework between main storage and operation tank, the design composed of using one pump to complete the following: use for reticulation and transfer of water. All designs included BIM for MTO take off to manage budgets and trade running (if required to complete any work) costing and shorten construction time down. Current working on the roof design to cover outdoor setting and BBQ area. All design meet required Drafting and Australian Standards and a complete set of design and construction drawings. June 2011 - August 2013 Ausenco Minerals & Metals Snr Mechanical Designer, Project Coordinator AutoCAD 2013, AutoCAD MEP 2013, Navisworks Manage 2013 & Pro- ProSteel June 2011 - June 2013 Kazakhmys Bozshakol Copper Project Working out of Perth to Project Coordinator Mumbai office taking a project which was at 30% complete and issuing it for 100% complete for construction over 16 months. Issue of drawing deliverables and tracing of all deliverables issued at different stages of the project, and tracking Hold Register, Vendor data. Running schedules on all drafting deliverables and man-hours on the design areas been worked on by the Mumbai Office. working with Multi disciplines on workloads, meeting schedules, budget hours and Strong Communication and High Level of Problem Solving, Computer Software followed the improving of Technical skills. Maintain a Positive Attitude into the working environment while working remotely, Keep the Team focused on the design, Problem Solving as problems come to hand. Planning, directing, coordinating and managing the activities design, personal groups assigned to small battery limits. Project coordination of multi-disciplinary project teams, and progress reporting. Reviewing engineering and design schedules, man-hour budgets and controls. Project meets technical documentation such as specifications, flow diagrams and plot plans. Monitoring multi-disciplinary designers progress on assigned project. Assuring compliance of engineering effort to project schedule, Weekly project update to company management and owners. Working alongside Perth and Mumbai designers on a Reclaim Tunnel design and Copper Concentrate load out building, to complete 3d models to extract 2d drawings. Working alongside Designers and Snr. Engineers to meet the schedule. Insuring that all design work meets required Project and Australian Standards, and meet budget requirements, Detail up drawings for elevations & section drawings, extraction fans inlet and outlet connection and conveyor systems layouts located under collectors and changing design by drawing up a and 3d model on the process system. The extraction of 2D layouts from the 3D models “HVAC, piping, mechanical equipment and air and electrical cable trays” for shop fabrication drawing and bill of materials. Inputs came from existing Engineering manual drawing and site sketches, and 3D modelling from clash detection software. The Checking of pipe supports, access platforms, stairs ladders and HVAC and all new conveyors, bins and cutes and managing progress drawings, which included piping, HVAC duct drawings, batch hoppers, material take offs and all project drawings for the release for construction. Using life 3d models plate work, steel work to generate 2d layouts, Plans, Sections and Elevations in Pro-Steel 2D section for design and vendor issue. This includes working with Mechanical and Pro-Steel Engineers to complete design and include changes. Using Navisworks to complete Design Reviews and clash detection for all disciplines and changing the design meets the project design and standards. The issue for match up images to design personal to incorporate design, clash detection or new vendor/suppler data. Reviewing of all Pro-Steel , piping mechanical design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s. Checking of work packages and marking up information and returning for update and issue under the current revision. Weekly update and drafting deliverables and progress reporting. Updating cad systems and supporting personal in the use of pro-steel. The use of Pro-Steel to give live design changes but plate work and steel MTO’s. Ausenco Mumbai – India Tucano Gold Mine Working out of Mumbai office taking a project which was at 15% complete and issuing it for 100% complete for construction over 6 months. Working with Perth and Mumbai designers, drafters and Snr. Engineers to meet the schedule. Weekly update and drafting deliverables and progress reporting. Checking of all Pro-Steel design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s and piping isometric’s. Using life 3d models plate work, steel work to create layout, sections elevations in Pro Pro-Steel Auto-plant to create life 2D section for design and vendor issue. Weekly update on Project Design and drafting deliverables and progress reporting Using of Naviswork 2013 for clash detection , design review and design progress and vendor data review. Updating cad systems and supporting personal in the use of Pro-Steel and Auto Plant. The use of Pro-Steel to give live design changes but plate work and steel MTO’s. Drawing on past Experance to help with Training Engineers and Draftsmen to meet Australia Standards and Document Control Procedures. Intrudes a Positive Attitude into the working environment, Maintain Team focused on the design, Problem Solving as problems come to hand. Planning, directing, coordinating and managing the activities design, personal groups assigned to small battery limits. Project coordination of multi-disciplinary project teams, and progress reporting. Reviewing engineering and design schedules, man-hour budgets and controls. Project meets technical documentation such as specifications, flow diagrams and plot plans. Monitoring multi-disciplinary designers progress on assigned project. Assuring compliance of engineering effort to project schedule, Weekly project update to company management and owners. Setting up the next process data transfer and design process to meet all project and design process to be issued to Ausenco Mumbai, Remote Office (Mumbai) experience back to Perth , working with Multi disciplines on workloads, meeting schedules, budget hours and Strong Communication and High Level of Problem Solving, Computer Software followed the improving of Technical skills Projects: Kazakhmys Bozshakol Copper Project (1.9 Billion) Bozshakol Clay Project study (120 million) Tucano Gold Mine (110 million) Matrix Composites & Engineering Snr Mechanical Draftsmen & Project Engineer AutoCAD 2009, AutoCAD MEP 2010, Navisworks Manage 2010, Pro-CAD 3D Smart & Pro-Steel May 2010 – May 2011 At Henderson feasibility Design layouts of piping systems stainless steel tube and Sch 80 pressure process systems and Pro-Steel platforms, and plant access , pipe systems and conveyor bridge linking to storage silo’s. Using of Navisworks for clash, design review and design progress for vendor data review and work progress complete. Responsible for preparing and reviewing, design drawings and other information. Supports construction and procurement with preparation of drawings and material take offs. Reviews drawings and assists with collection of design information required by construction and procurement. Incorporating engineering practices, design details, international codes and standards, procedures and specifications. Directly involved with development, enhancement and maintenance of 3D graphic visual display and modelling work. 3D modelling of new plant, detail pipe & tube layouts, isometrics a Pro-Steel drawings on elevations & section drawings, design 3d model on the high pressure process system. 3D Model layout on high pressure process and all steel work and high presses pipe and tube feed conveyor systems, and piping system covered oil and resin. Design layouts of process and Pro-Steel working platforms, pipe/conveyor Bridge. Checking of vender deign and drawings piping and tubing and Pro-Steel steel drawings, material take offs for construction. This includes checking P&ID’s, Plant layout, 3D modeling of the plant and Pipe work using 3D SMART Procad pipe. Using Prosteel to 3D Model all steel layouts to complete pipe & tube runs and tube feed conveyors. Using Naviswork 2010for design review and clash detection Overseeing the Fabrication and Installation and of all low pressure Tube system (900kPa) process room and high pressure piping (sch80 RTJ valves /flanges) system (1700kPa) piping in the main process building. Coordinating work packages and the writing up work area scope of work and review proposal packages. Fabrication of 8 off, 60 000liter storage tanks and installation. Writing up tender documents to the high and low pressure process and steel platforms, walk ways for fabrication. While meeting project schedules, and procure tube, valve and fittings. While under construction working with tube and high pressure pipe fitter and boiler makers. Following up on steel fabricator and equipment installers. Updating and meeting project schedule and completing work before schedule outlined. Any design changes met strict process to stay within piping P & ID’s with approval from process engineer and project manager. Responsible for scoping, planning, directing, coordinating and managing the activities design, site installation personal groups assigned to small battery limits. Estimating of piping, Pro-Steel and tanks to let contracts for fabrication, project coordination of multi-disciplinary project teams, and progress reporting. Developing a definition of the scope of engineering services to be provided by the company. Reviewing engineering and design schedules, man-hour budgets and controls. Approving all project technical documentation such as specifications, flow diagrams and plot plans. Monitoring engineering expenditures and progress on assigned project. Assuring compliance of engineering effort to project schedule, control estimates and company procedures. Weekly project update to company management and owners. Commissioning Engineer Overseeing construction process to meet client design and process design and that plant meet Australia standards from a construction, commission and maintenance while under production. Checking of all vendor data and checking all design data to all process data before any commissioning takes place. Checking and all pipe lines, fixing and confirming it meets the design process. Training site personal once the plant is commission has taken place after the first 100 hours. Project: New facility in Henderson ($ 32 Million) Tiwest Joint Venture Snr Mechanical Designer AutoCAD R 2009, AutoCAD MEP 2010, Navisworks Manage 2010 & Pro-Steel April 2009 – April 2010 On site Chandala for the design RI recovery operation and conveyor to replace of existing RI recovery hopper and conveyor. This included accessing existing building and road way and existing drainage. The design included mechanical layout front end loader access to 40t hopper and new conveyer. Updating of Process Flow Diagrams and Piping and Instrumentation Diagram, site plan update and generate a set of mechanical layout and section drawings to match design change. The design included Hopper design, concrete bunker and conveyor with tail and head chute feeding into 8” (203mm sch80) pipe work and isolation valves into a hot bin with bypass system to feed into conveyor system. Civil layout for conveyor and hopper drawing for foundations. Checking and red lining of design drawings for the following disciplines, Mechanical, Pro-Steel , Piping and civil Drawings for 23klt Activated Carbon Process and re-issuing back to EPCM. This included checking design of two existing Pro-Steel , pipe work and location of mechanical equipment’ i.e. conveyor head and trail chutes, Pro-Steel and piping levels’. Layout on a 54 meter long x 35meter wide Activated Carbon storage shed to access with B-trains and forklifts. Design included B-train turning circles and drainage to the building. At Kwinana feasibility study Design layouts of process to introduce Lime process to replace existing Limestone process in area 600. Tanks, pumps, hopper and conveyor. Updating Lime PFD & P &ID’s to include into lime stone into existing Lime process. Plant layout to include storage tanks, conveyor and low level feeder including pump layouts. Included in the design for front end loader, semi-trailer turning circles. Pro-Steel stairway, working platform and ladder access to tanks and actuators. Mechanical feed hopper, discharge chute and pipe layouts for pumps. Project: Kwinana Feasibility Project (Congo) (5.5 Million) Chandala RI Recovery ($ 25 Million) Ausenco Minerals & Metals Snr Mechanical Designer Draftsmen AutoCAD R 2008. October 2008 – November 2008 Design layout of process Tanks, pumps and CCd’s to match PFD process and size of equipment match data sheets. By producing plan, elevation and section drawings for design review for costing. Process plant layout for the following process areas Copper leach circuit, CCD thickeners, Reflux thickening and clarification, cobalt leaching circuit Sulphur dioxide absorption process. Checking of layouts on each battery limit to make sure all piping and Pro-Steel will be located in the right location once we move into detail design in the all areas. All drawing meet the required drawing office procedures to meet all required AS/NZ codes. Project: Mutanda Copper Project (Congo) ($ 1.1 Billion) Worley Parsons Hydrocodone’s Snr Piping Designer – AutoCAD R2005 – Auto Plant 3D Piping & Pro-Steel June 2008 – October 2008 3D modelling of current and future plant, detail pipe layouts, isometrics a Pro-Steel drawings on elevations & section drawings, design 3d model on the process system. Checking of drawings piping, Pro-Steel steel drawings, material take offs for construction. This includes checking P&ID’s , Plant layout, 3D modeling of the plant and Pipe work using Autoplant. Using Prosteel to locate existing and future steel layouts to complete pipe runs. Checking all pipe routing, Material take off and Item listings and all drawing meet the required drawing office procedures including all AS/NZ codes. On site checking piping routes and structral pipe supports, rack, including civil works for new designs. Project: BP refinery Kwinana ($ 11 Million) Bateman Engineering Lead Designer – AutoCAD R 2005 – Auto Plant 3D, Pro Pro-Steel . June 2007 – June 2008 Responsible for scoping, planning, directing, coordinating and managing the activities design, site installation personal groups assigned to small battery limits. Estimating of piping, Pro-Steel and tanks to let contracts for fabrication, project coordination of multi-disciplinary project teams, and progress reporting. Developing a definition of the scope of engineering services to be provided by the company. Reviewing engineering and design schedules, man-hour budgets and controls. Approving all project technical documentation such as specifications, flow diagrams and plot plans. Monitoring engineering expenditures and progress on assigned project. Assuring compliance of engineering effort to project schedule, control estimates and company procedures. P & ID, PFD & 3D model, detail pipe, civil & Pro-Steel drawings on details, elevations & section drawings, design 3d model on the process system. Working with alongside designers, drafters and Snr Engineers to meet the schedule. Weekly update and drafting deliverables and progress reporting. Using life 3d models plate work, steel work to create layout, sections elevations in Pro-Steel Auto-plant to create life 2D section for design and vendor issue. Checking of all Pro-Steel design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s and piping isometric’s. Using of Navisworks for clash, design review and design progress and vendor data review. Managing all progress, included piping, Pro-Steel steel drawings, material take offs and all project civil drawings for the release for construction. This includes checking P&ID’s , Plant layout, 3D modeling of the plant and Pipe and ProSteel work using Autoplant pipe and prosteel. Checking all pipe routing and material spec’s, including all ProSteel steel plate (Prosteel) between crushing and grinding and overland convoyer to the leach pad . ProSteel for the pipe racks, CCD’s tanks pipe supports and access platforms and all drawing meet all drawing procedures and meet all required AS/NZ code on each discipline, stairs. Checking all Material take off’s and Item listings. On site civil works construction and design, checking of levels. Setting up of AutoCAD Menu systems Title blocks, plot styles. Including a adding a continuous improvement plan in maintain Cad systems, Auto plant and drawing office procedures to meet all required AS/NZ code on each discipline. Project: Muliashi Copper Project ZAB710 (Zambia) ($1.25 Billion) HPS Environmental Enerflex Lead Draftsmen – AutoCAD R 2005 - Micro Station V8 August 2006 – June 2007 Manage of drawings schedules for Design of water and clean & dirty air extraction system, drawings P & ID, Isometrics and PFD, detail pipe drawings on elevations & section drawings, extraction fans inlet and outlet connection and conveyor systems layouts located under collectors and changing design by drawing up a and 3d model on the process system. The extraction of 2D layouts from the 3D models “HVAC, piping, mechanical equipment and air and electrical cable trays” for shop fabrication drawing and bill of materials. Inputs came from existing Engineering manual drawing and site sketches, and 3D modelling from clash detection software. The Checking of pipe supports, access platforms, stairs ladders and HVAC and all new conveyors, bins and cutes and managing progress all HPS drawing office and contractor drawings, which included piping, steel duct, Pro-Steel drawings, batch hoppers, material take offs and all project drawings for the release for construction. Setting up of AutoCAD Menu systems Title blocks, plot styles. Including a adding a continuous improvement plan in maintain Cad systems and drawing office procedures to meet all required AS/NZ codes and disciplines. Project: Tom Price DCB upgrade ($ 1.5 Million) BHP Mining Area C ($ 12 Million) BHP Yandi Expansion Project ($ 10 Million) Wesfarmers Kleenheat Gas Drawing Office Supervisor/CADD Manager AutoCAD 12 - 2007 July 1995 – August 2006 Design of Major Storage Facility, Automotive gas (autogas), Industrial and Commercial LPG installations. A thorough Knowledge on the required AS/NZ codes for the Design of LPG / LNG gas installations and storage felicities and maintaining a high level of safety at all times in the design process. Participate in design reviews, advice on technical design and drafting issues and compliance requirements as appropriate. Working alone side and overseeing all designs drawings from sketches, notes, plans, piping specifications to produce accepted designs for best practice and company process. Checking of all site layouts, in piping and routs, structure supports, ladders, stairs and cylinder storage platforms including material take offs. For the all LPG /LNG installations “bulk storage, road transport, fuel stations and industrial installations around Australia. To make sure all Australia standards (AS/NZ code s) are met. 2D in piping and civil layouts and designs including transferring 2D design to a 3D modelling to review design, when required. Piping layouts on plot plans, process equipment, and piping systems including (pump sets, compressors, vaporizers, boilers, pressure regulators, and pressure vessels, unload and load facilities). Detail design on mechanical equipment, drawing up of P & ID’s and producing piping designs and layouts from P & ID’s, material takeoffs. Checking of drawing to meet all require to local Government and Australia standards to meet the installation and operation process. Setting up of AutoCAD Menu systems (drop down menu, tool bars, dynamic blocks) to include the following Autogas, Industrial, Commercial, Standard symbols, LPG & LNG facilities, LPG & LNG P & ID’s, 2D and 3D piping fittings, fire protection systems, Gas reticulation systems, Pressure vessel layouts, Title blocks, steel sections and details. All blocks – symbols to transfer data to a database to extract material list from drawings. Including a adding a continuous improvement plan in maintain Cad systems and drawing office procedures to meet all required code and disciplines. Implementation setting a Drawing and GIS registers and numbering system to work from an intranet system to record, view, AutoCAD, AutoCAD Volo View drawings, PDF Documents (Projects, Road Tanker Records and LPG and LNG facility Specifications and documents), including MapInfo Maps, Gas reticulation systems and analyst maps. Rolling out of using AutoCAD Volo View and MapInfo Pro viewer to view drawings and maps thorough out Australia. Implementation of AutoCAD Map and MapInfo GIS software for company gas reticulations systems and analyst maps. Setting up an operating system, procedures and standards to meet company procedures and compliance. Projects: Current Projects Nowra Gas Storage Facility – Nowra (N.S.W) ($ 1.25 Million) Proposed LNG Heavy Vehicle Refuelling ($ 1.75 Million) LPG Projects: 1994 – 2006 Project Manage office building maintains – Murdoch office (W.A) ($ 20 Thousand) Project Manage office building maintains – Myaree office (W.A) ($ 10 Thousand) Armidale Gas Storage Facility (Mott St) – Armidale (N.S.W) ($ 1.5 Million) Swan Hill Gas Storage Facility - (S.A) ($ 75 Thousand) Bulwer Island Gas Storage Facility - Pinkenba (QLD) ($ 3.5 Million) Darwin (Winnellie) Gas Storage Facility - (N.T) ($ 1.1 Million) Kwinana Gas Storage Facility - (S.A) ($ 75 Thousand) Bangladesh Gas Import Storage Facility - Port Mongla - Dhaka($ 35 Million) Bulls Brook Gas Storage Facility – Upper Swan (W.A) ($ 1.2 Million) Bulwer Island Gas Storage Facility - Pinkenba (QLD) ($ 1.1 Million) Adelaide Gas Storage Facility – Winfield (S.A) ($ 1.2 Million) LPG Road Tankers Redesign ($ 20 Thousand) LNG Projects: 2000 - 2007 Armidale Gas Storage Facility (Mott St) – Armidale (N.S.W) ($ 3.5 Million) LNG Road Tankers Design (LNG-101) ($ 50 Thousand) Sands Transport - (W.A) ($ 100 Thousand ) Mitchell Transport - (W.A) ($ 90 Thousand) Deer Park - (VIC) ($ 1.5 Million) Murray Goulburn - (VIC) ($ 1.2 Million) Connell Wagner P/L Contractor ProSteel Draftsmen – AutoCAD R 12 July 1994 – August 1994 As build drawings on foundation layouts, ProSteel steel walk way updates. Project: Coflexip Asia Pacific CMS Construction P/L Contractor Estimator (Civil) May 1994 – July 1994 Estimating from Engineering and Architectural which included drawings costs on concrete, formwork, man hours, etc. Projects: BHP: Cockatoo Island Iron Ore Project Alcoa: Substations and Switch rooms CSBP: Granulation plant T & Z Architects P/L Contractor Cad/Draftsmen – AutoCAD R 12 May 1994 Project: Submarine Trainee facility (Naval Base, W.A) Transfer of manual drawings into AutoCAD. Lenny’s Commercial Kitchens Estimator / Draftsmen September 1993 – April 1994 Estimating from Engineering and Architectural which included drawings costs on floor plans for Bars and Restaurants. Planning and tracking of projects implementing workload and project register, weekly progress reports, and multi project tasking. Material takeoffs and costing on stainless steel bench tops, Kitchens appliances, food display. Backpacking though Europe on Holiday April 1993 – September 1993 Main Roads Department Carlisle, Perth W.A Contractor Civil Draftsmen AutoCAD R 11 January 1992 – August 1992 As Builds on Industrial and Commercial crossovers and drainage details. Design and details construction drawings in 2D and 3D drawings of Compensation Basin on the Token freeway. Including all sections and detail. Following up on accidents reports for the Mitchell Freeway. Progress reports on the raster transfer of Kings Park to AutoCAD. Projects: Kings Park drawing transfer Token freeway Compensation Basin Hydrocarbon Recovery Techniques Piping Designer AutoCAD R 11 January 1992 – August 1992 Process Design layouts and pipe fabrication drawings including pipe supports on oil recover units. Piping design sketches, plans, specifications and suppler data. Design skid mounted pumps and heat exchanges to be transportation. Drawing up 3D modules on plant layout on equipment. Linde AG Piping Designer AutoCAD R 11 September 1991 – November 1992 Process Design piping layouts and pipe isometrics drawings including material take offs. Overseeing of piping design and detail drawings from sketches, notes, plans, designs, specifications and data. Drawing detail design from P & ID’s and producing piping layouts. Drawing up 3D module on stage 3 plant, Moss Gas layout and equipment. Pressure Vessel detail sections and design (pump sets, compressors, boilers and load facilities). Bill of material take offs on piping systems and ProSteel steel. Setting up of Drawing register and document control system. Projects: SASOL 3 Moss Gas (60) Fuel Tanks and Pressure Storage Spheres United Construction P/L Piping Designer April 1991 – August 1991 Pipe materials take offs for Stainless and Carbon piping isometrics for shop fabrication. Setting up of recording of weld heat numbers and running fabrication reports. Issuing of working and releasing materials for fabrication. Maintaining records on pipe spools/isometric design variations and the recover of pipe fittings. Including keeping up to date with all the required specifications and progress reports. Planning and tracking of work load and all material use on project, weekly progress reports. Projects: North West Shelf Stage 3 Tub Bridge Gas Field Development Pinjar Gas Turbine Station Stage 3 Phillips Engineering P/L Henderson W.A Estimator April 1988 – August 1991 Estimating from Engineering and Architectural which included drawings costs on process plants and mining sits. Material take offs on chutes, conveyers, tanks, ProSteel steel and piping. Monitoring of fabrication of components, welding procedures and checking of ProSteel . Projects: Ocean Shipyards (workshop extensions) Mineral Sands St Ives Gold Mine United Construction P/L Contractor Project Pipe Designer & Scheduler January 1987 – May 1988 Manual drafting on revised piping isometrics and document control on Post weld heat treatment (PWHT) including NDT records. Pipe materials take offs for Stainless and Carbon piping isometrics for shop fabrication. Setting up of recording of weld heat numbers and running fabrication reports. Issuing of working and releasing materials for fabrication. Maintaining records on pipe spools/isometric design variations and the recover of pipe fittings. Including keeping up to date with all the required specifications and progress reports. Onsite running of Gantt charts, planning and tracking of project weekly progress reports on multi projects. Projects: North West Shelf Stage 2 North West Shelf Stage 2 (Domgas) December 1986 - Emigrated to Australia » Interest Landscape Photographic, gardening, carpentry, Sailing.
Perth, Western Australia, Australia
Imran Niazi - Freelance Fashion Illustration & Fantasy Art
0
Kudos
4.0
2 Skills
$25
Rate/Hr
OBJECTIVE Seeking a challenging position as a Pattern Maker where I can utilize my skills. SKILLS Computer operate , Internet (Browsing and Surfing .emails) Gerber Software Accu Mark 7.65 , 8.0, 8.2 , 8. 5 , Ms-Office Manual Pattern Maker and well know Garments Technical issue Strong Follow up tack pack or sample and supervise to sample man EDUCATION 2005 Bachelor Of Arts – University of Karachi Pakistan 1997 Inter Commerce -S M Collage Karachi Pakistan 2001 Information Technology Diploma ---Graphic Vision Karachi Pakistan 2003 Pattern Making and Grading Course ---PRGTTI Karachi Pakistan 2005 Cad Cam Pattern Making and Grading Course ----PHMA – Karachi Pakistan LANGUAGES English , Hindi , Urdu BUYER Work With Buyer Aeropostal , Jones , American Eagle , Gap , Old Navy , CR Europe Buyer H & M , Pull & Bear ,Zara , Auchan , C & A , Colin’s EXPERIENCE Aug 2000 Quality Assurance Supervisor June 2001 Oriental Garments Korangi Industrial Area Karachi Pakistan Responsibilities inspection all Garment and Measuring During Stitching July 2001 - Assistant Pattern Maker June 2002 Shancha Garments Korangi Industrial Area Karachi Pakistan Responsibilities Make sure follow all comments and Sample Supervision and Provide to all trims and tack pack or sample for development ,and all kind of sample and help with Pattern Master and Create small part pattern and template ,Measure All garments and send too wash after washing to supervise finishing depart to dispatch sample . July 2002- Pattern Master/Maker July 2011 Ali Murtaza Associates 186 Plot Sector 23 Korangi Industrial Area Karachi Pakistan Create Pattern and Grading Manual and Computer Pattern Making Follow Tech Pack or Sample as per buyer given all detail for development, fit sample and all kind of sample also Responsible to follow all correction and comments following in production and samples July 2011- Pattern Master/Maker & Garments Technician & Sample Manager November 2014 Artistic Garment Industries , Plot 60 Sec 15 Korangi Industrial Area Create Pattern and Grading at Computer ,Follow Tech Pack or Sample as per buyer given all detail for development, fit sample and all kind of sample also wear sample to dummy to insure before sending check and solve all fitting comments and Responsible to follow all correction and comments in production and samples make decision for production and sample References and portfolio available upon request.
Newark, New Jersey, United States
Anji - Freelance Graphic Design & Logo Design
0
Kudos
3.0
2 Skills
Ask
Rate/Hr
Curriculum Vitae Anji.J Mobile:9640360346 E-Mail: anjidesigner1@gmail.com Career Objective To seek a challenging position in a professional and component atmosphere where I can use my skills those enable me to hope with the emerging trends and technologies for the growth of organization. Seeking challenging assignments in Designing and Animations. As a Professional, I am creative and innovative and looking ahead to work in a challenging environment and strive for excellence. Synopsis Over 2years of Experience in Graphic Designing and Web Designing. Experience in Making Logos, 2D Animations and Presentations. Hands on experience in Formatting, Installation of Software’s and Operating Systems and Troubleshooting. TECHNICAL SKILLS Visual Effects : Adobe Photoshop cs2 Adobe Image Ready 7.0 2D Vector Graphics : Adobe Illustrator cs2 Corel Draw 13 2D Vector Animations : Macromedia Flash 8 Swish Web Designing : Macromedia Dream weaver 8 Scripting : Flash Script (Exposure) IT Skills Operating Systems : Windows 2000/Xp, Web Technologies : HTML, Css, java Script,Jquery Web Developing Php, My SQL ,Joomla , Drupal , Wordpress tools coustmization(fresher) SEO (onpage and off page seo) HTML coding optimization and standards. Exposure on Google Webmaster tool. Search engine submissions. Website content writing for seo. Keyword analysis, website analysis, Competitors Analysis. Competitors Research for better search engine placements. Search engines vs. Directories SEO Press Releases. Google Analytics. Seo tools and usage Directory Submission. Organizational Experience I have 2 years exp in Task Informatics AP Pvt. Ltd as a web designer Areas of Interest 1 Web Designing, Graphic Designing and Logo Designing. 2 2D Animations, 2D titling. Strengths 1 Excellent Visual Comprehensive abilities. 2 Excellent Written and Communication Skills. 3 Hard working and Self Confidence. 4 Turning my imaginations into reality in works. Academic Credentials 1 S S C Completed in vidya bharathi high school(Nidmanoor Nalgonda) 2 Inter midit(Bi.pc) Nagarjuna college (Haliya) (Nalgonda) 3 Degree (B.Sc) Nagarjuna Degree college (Nalgonda) Personal Profile Personal Information: Father's Name : J.Muthyalu Date of Birth : 2, Sept, 1985 Nationality : Indian Languages Known : Telugu, Hindi and English Permanent Address :H No11-4-10/2 Srinivasa Colony Saroor Nagar Hyderabad, A.P, India, PIN 500 070 PH: +91-9640360346 Declaration: I hereby declare that the above written particulars are true to the best of my knowledge. (J.Anji)
India
Robert Blankenship - Freelance Comic Art & Ad Design
7
Kudos
4.5
2 Skills
$45
Rate/Hr
Hi! My name is Robert Blankenship aka PaperGhostDesign; Illustrator, Graphic Designer and all-around interesting character. Currently seeking fun and fulfilling work in the exciting wild and woolly World of Tomorrow! I have several years experience in print advertising and promotion. Logo design, branding, character creation, and more! You can find out all about me at my website! I AM PaperGhostDesign and I rule tiny worlds! What can I do for you?
Charlotte, North Carolina, United States
M. Wayne Miller - Freelance Digital Art & Horror Art
820
Kudos
5.0
2 Skills
$25
Rate/Hr
ENnie Award winning illustrator M. Wayne Miller continues his quest to synthesize the perfect blend of science fiction, fantasy, and horror with his work. Having carved a place among the best in the industry, he welcomes the challenge and reward of ever greater achievement, and ceaselessly strives to learn and grow as an artist and illustrator. His list of clients include Thunderstorm Books, Celaeno Press, Chaosium, Kobold Press, and Pinnacle Entertainment Group, as well as numerous authors and private collectors.
Greensboro, North Carolina, United States
Tom Powell - Freelance Graphic Design & Logo Design
0
Kudos
5.0
2 Skills
Ask
Rate/Hr
OBJECTIVE ~ To manage a business discipline that focuses on practical and creative techniques in all marketing activities and resources; to help develop unique brands that result in gaining market share. QUALIFICATIONS ~ Nearly twenty (20) years as a creative brand advocate for clients in the retail, service, hospitality, travel and education industries. SKILLS ~ • Create, produce and schedule multi-media campaigns across all marketing platforms including traditional (TV, radio, direct mail, outdoor, print) and new mediums (online, web, social, viral, guerilla, mobile apps). • Create and manage Search Engine Optimization (SEO) campaigns, all platforms of Social Media marketing, Web and New Technology campaigns. • Manage creative and accounts services staff. Manage processes from concept and inception to production and placement of all marketing campaigns. WORK HISTORY ~ 1996-2012 President and Creative Director, The Addison Group - a full service advertising, marketing and public relations agency 1994-1996 Art Director, Virginia Graphic Design - a boutique graphic design an advertising company PASSIONS ~ Family; Community involvement and leadership; Coaching youth sports EDUCATION ~ BS in Communications Pensacola Christian College
Solon, Ohio, United States