Freelance Comic Artists : Hillsboro, Oregon

Category
Skill
Country
Region
City
Keyword

For Freelancers

  • Create an awesome portfolio to showcase your talent.
  • Rub elbows with the web's most talented freelancers.
  • Earn money doing what you love to do.
  • And much more...

For Employers

  • Post your freelance job in just 30 seconds. It's free!
  • Instant access to the web's most talented freelancers.
  • Hire an unlimited number of freelancers.
  • And much more...
 Freelancers 
 Portfolios 
 

Search Results

  Portfolios   Sort

More Freelancers

Malika - Freelance Translation & Medical Translation
0
Kudos
4.5
2 Skills
$45
Rate/Hr
• Maintained a professional attitude and appearance as a translator for non-English speaking customers. • Assisted in scheduling meetings and ordering office supplies while ensuring client services were provided
United States
Oxana V Volokhova - Freelance Russian Translation & Presentation Assistance
0
Kudos
5.0
2 Skills
$20
Rate/Hr
I am a native Russian Speaker. I graduated from Tula State University, Russia with the degree in Interpretation and International Communication. I have recently graduated from the ITT Technical Institute with the Bachelor's Degree in Criminal Justice.
Orlando, Florida, United States
Thom Solo - Freelance Digital Art & Graphic Design
0
Kudos
3.0
2 Skills
$30
Rate/Hr
My interest in the comic book and cartoon world began when I was kid watching classic Hanna Barbara cartoons and reading the classic Batman and Superman comic books. In high school I drew one panel comic strips for the school paper and in college I majored in Graphics Technology giving me the grasp of using photoshop to digitally color the comics and cartoons I draw today. My recent jobs have been: Writing, layouts, and Digital Color for the web comic "Roomies" at freakincomic.com. Promo Art for a band called Bubba and the Whoopoffs Promo Art for a band called Soul Circus Cowboys Promo Art for a radio show Mike and Crew in the morning
Davenport, Florida, United States
Nora Leslie - Freelance Bookkeeping & Payroll Management
0
Kudos
4.5
2 Skills
$40
Rate/Hr
835 Ormewood Terrace, SE Atlanta, GA 30316 404-635-0661 naleslie@comcast.net Nora Leslie Objective To assist small companies by applying financial and tax saving experience in addition to full general ledger bookkeeping. Full charge bookkeeping practicing GAAP. Experience 2012 – Present American Mortgage Advisors Norcross, GA 2012 - Present Fernandez & True Atlanta, GA 2003 - Present David Butler & Associates Atlanta, GA 2004 - Present Turning Wood Renovations Atlanta, GA 2004 - Present Pro Coat Painters Inc. Atlanta, GA 2008 - Present Urban Pet Supply, LLC College Park, GA 2008 - 2010 Zerorez of Atlanta Norcross, GA 2002 - 2008 Design Galleria, Ltd Atlanta, GA 2002 - 2008 Academy Construction Inc. Atlanta, GA 2002 – 2008 Happy At Home Atlanta, GA 1997–2002 Goldleaf Construction Atlanta, GA 1997-1999 HLM Accounting & Tax, Inc. Decatur, GA Bookkeeping Duties provided to all customers: All payables and receivables including job costing. Reconciling Bank Statements and Credit Card Statements. Preparing payroll and payroll tax reporting. Responsible for Workers Comp certificates and annual audits. Responsible for reporting Sales Tax. Education Hiram College Hiram, OH Georgia State University Atlanta, GA
Atlanta, Georgia, United States
Taylor - Freelance Wedding Photography & Event Photography
2
Kudos
5.0
2 Skills
$50
Rate/Hr
Do you want to remember your special occasion with blurry iPhone photos or gorgeous clear fully edited photos? I'm a local photographer in the Birmingham area. I do on scene photography. I treat your photos as if they were my own. I want to give you the very best images you can get. Contact me for more details.
Birmingham, Alabama, United States
Elena Grieve - Freelance Translation & Admin Support
2
Kudos
5.0
2 Skills
Ask
Rate/Hr
Freelance Translator English - Russian: Native Russian Speaker - Responsible, accurate, assiduous, hard-working, personable, excellent communication skills, multi-task, ability to work under pressure with set deadlines. Specializing in Document Translation, Technical Translations (Oil and Gas Industry), Legal Translation, Museums/Art, Judicial and Contracts, Medicine, Finance/Economy, Transport/Customs/Logistics Software: Windows XP, Windows Vista, Microsoft Office 2007, Open Office, Acrobat Reader, WinZip, Adobe Acrobat, PowerPoint, Project, MS Publisher, SAP, Photoshop, Passolo.
Totnes, Devon, United Kingdom
Marknaftal - Freelance Quality Assurance & Software Testing
0
Kudos
4.0
2 Skills
$30
Rate/Hr
Mark Naftaliev Entry Level Quality Assurance Tester/ Analyst E-MEIL: naftal772@gmail.com TEL: 416-464-5896 TEL: 416-999-8726 ADDRESS: 284 Mill RD Apt A 8 Toronto ON M9C 4W6 Canada • PROFILE: • 1+ year of experience in all aspects of Application Testing. • Working knowledge of QA Methodologies and Software Developing Life Cycle (SDLC) • Hands-on experience in Test Planning, Writing Test Documentation, Execution, Results Analysis Defects Tracking and Reporting for Manual Testing environment. • Excels in dynamic, high-pressure environment using initiatives skills and results-oriented work ethic. • Success in collaborative and independent work environment. • Excellent communication skills to leverage positive relationships with clients and peers. TECHNICAL SKILLS: OPERATING SYSTEMS MS WINDOWS, MAC OS, LINUX, MICROSOFT OFFICE MAC BUG TRAKING TOOLS MANTIS, BUGZILA, JIRA DATABASES SQL, MYSQUL SDLC MANAGEMENT TOOLS HP QUALIITY CENTER PROJECT MANAGEMENT TOOLS BASECAMP, TEAMWORK WEB TECHNOLOGY HTML, CSS, XML TESTING METTHODS FUNCTIONAL TEST, REGRESSION TEST, SYSTEM TEST, INTEGRATION TEST, SMOKE TEST, etc • PROFESSIONAL EXPERENCE: • Entry QA Analyst (contract) 2012.10 • North America Jobs Employment Services, Toronto, ON • Reporting to the QA Team Lead, tested recruiting web based real time application and database. • Participated in test planning and execution during defined Release cycles and according to defined test plans and test cases. • Assisted in Functional, Regression, Acceptance, Volume, Security and Performance testing of web based real time applica¬tions. • Evaluated business requirements and prepared a corresponding feasibility analysis. • AUDITED BUSINESS: • And functional necessity documents and recognized test scenarios • Participated in implementing test-plans and test-cases built on high-level and detailed design. • Managed and maintained defects in JIRA bug tracking system. • Broadly done manual testing, constraints verification testing, and the functional testing. • Involved in the Test Case walkthroughs, assessment meetings. • Interfaced with development group to resolve the difficulties came across in a test execution. • EDUCATION CERTIFICATION: • Certificate in Quality Assurance Testing, • New Image College of Design Technology 2012.10 • References Available Upon Request • Intermediate level of English • Fluent in French, Hebrew and Russian.
Toronto, Ontario, Canada
Hany S Estefanos - Freelance Mechanical Engineering & Project Management
1
Kudos
3.0
2 Skills
Ask
Rate/Hr
Hany S Estefanos 3641 Brookridge Ter, Harrisburg, PA, 17109 Phone: 717-889-1869 Cell: 717-686-3643 Email: hestefanos@yahoo.com SUMMARY OF EXPERIENCE Mechanical engineer - 9 years of experience, Involved in all aspects of a Mechanical engineering & Civil Construction with solid knowledge of the Planning & Scheduling Projects. Strong commitment to continue learning, leading edge technology, challenging construction projects, values, and diversity, proficient in using project management software such as Primavera / MS Project. Several years of field construction scheduling experience involving large-scale projects. EXPERIENCE 1. Prospect Expressway / Gowanus Expressway Emergency Repairs and Interim Deck Replacement (NYS-DOT) -Schedule Engineer: (2009/2010) 1 Duties and project Description: • Reviewing & analyzing the project Schedule updates. • Utilize Primavera (P6) software to measure the Project progress. • Using Claim digger to compare the updated schedules. • Review change orders and time extensions • Time impact analysis and delay analysis using various methodologies to present the Schedule impacts • Impacts dispute. • Attend the CPM meeting with NYSDOT and the G.C • Project Description: The $150 Million Project entails the replacement and/or repair localized deteriorated Bridge deck concrete and Structural Steel Superstructures in various areas, Restore Bearings & Paint the repaired Structural Steel. Widening existing Eastbound Gowanus, Expressway viaduct from Bent 255 to Bent 280, Widening egress Ramp J & Ramp F within the widening limits. Operate the Bus/HOV on the Gowanus Expressway from Verrazano- Narrow Bridge to the Brooklyn Battery Tunnel and on the Prospect Expressway from 5TH Avenue to the Brooklyn Battery Tunnel. 2. Replacement of Willis Ave Bridge over the Harlem River (NYC-DOT)-Schedule Engineer: (2009/2010) 2 Duties and project Description: • Follow up the construction activities • Analyzing the project Schedule updates. • Utilizing Primavera (P3) software to measure the project progress. • Using Claim digger to compare the updated schedules. • Review change orders and time extensions • Time impact analysis and delay analysis using various methodologies to present the Schedule impacts. • Impacts dispute. • Project Description: This Project involves the replacement of Willis Ave Bridge over Harlem River and the reconstruction of the adjacent areas. In addition, a new connector ramp bridge structure to the northbound Major Deegan Expressway and adjacent at-grade modifications, including pedestrian/bicycle amenities will be constructing. The entire approach of FDR ramp, First Ave ramp, the entire swing span, the entire through truss flanking span, and the entire Bronx approach span. The entire approach of the First Ave, The entire Willis Ave approach & the entire Bruckner Boulevard approach ramp will be demolishing. New construction includes, FDR Ramp and Mainline approach from First Ave, Spans over Manhattan Bus Loop, Harlem River Drive, Manhattan Relieving Platform, Harlem River (Fixed & Swing Span), Harlem River Rail Yards, Bruckner Boulevard Ramp & Mainline Approach from Willis Ave. The Construction Cost is $610 Million. Using Primavera (P3) Software as analyzing & measuring progress tool for the Project. 3. Fairfield, CT Railroad Station (CT-DOT) –Schedule Engineer: (2009/2010) 3 Duties and project Description: • Reviewing & analyzing the project Schedule updates. • Utilize Primavera (P3) software to measure the Project progress. • Using Claim digger to compare the updated schedules. • Review change orders and time extensions • Time impact analysis and delay analysis using various methodologies to present the Schedule impacts • Attend the CPM meeting with CT-DOT and the G.C • Project Description: The $146 million Project includes the construction of a new vehicular bridge and a new pedestrian bridge over the railroad. In addition, this project involves the construction of 1,020-foot long high-level double-tee platform with full-length canopies and a stair tower and elevator structure to the proposed overpass. The roadway work includes the construction of a new four-lane approach roadway from Kings Highway East #2 at the present intersection with Frank St. to the new vehicular bridge. The new Access Road will be four 12’ lanes with two 2’ shoulders and two 5’ concrete sidewalks from intersection of Kings Highway East #2 across the new vehicular bridge into the Developer’s roadway south of the tracks. This roadway will be a town road after the project is completed. 4. Boston University Bridge Rehabilitation - Schedule Engineer: (2009) 4 Duties and project Description: • Study the project’s plans and specs to determine the project’s work breakdown structure. • Initiate primary Schedule using Primavera (P3) to include the project’s headlines • Modify and detail the project’s Schedule to acceptable level. • Modify and prepare printouts of the Schedule versions. • Determine the project-estimated duration. • Project Description: Analyzing the methods and workflow process necessary to restore this historic bridge to current standards. The $20 million project involves the reconstruction of an 800-ft-long, four-lane street bridge known as the Boston University (BU) Bridge, which is a vital link in the heart of the college campus. The estimated project proposes to rehabilitate and repair several components of the BU Bridge. Work was conducted on the existing main span steel truss, the concrete arches, piers, the approach spans, abutments, the wing walls, and the pedestrian railing. The entire drainage system will be replaced and improved to further prevent pollution to the Charles River deterioration of the structure. He will apply special staging, phasing and logic strategies to schedule the most efficient program, using Primavera software. 5. The New Jersey Turnpike Widening Colonial & Sunoco Pipeline Relocation – Scheduler: (2009) 1 Reviewing Sunoco’s relocation pipelines schedule submission for accuracy. The project encompasses 19 pipeline relocations along 40 miles of the New Jersey turnpike between exit 6 and 8. Reviewed milestone dates and relationships between Colonial and Sunoco pipeline relocations. He assisted with scheduling formats in order to roll up activities developed for project manager’s meeting. 6. NYCSCA - Mentor Program-Scheduler: (2008/2009) Scheduler position for the NYCSCA Mentor program in Long island city, Queens. This program is for the contractors whose starting business with the SCA to make them aware of SCA requirements for its project and make them qualified for the graduate program (Mentor program concerns with projects less than $1 M) Duties include: 2 Review and comment on projects schedules, updates & Two week look-ahead. 3 Create or modify projects schedules, updates & two weeks look-ahead. 4 Mentoring & tutoring contractor to comply with SCA requirements for projects schedule and teach them the basics of scheduling techniques. 5 Projects include Civil, Mechanical and Electrical works 6 Projects: Philip Randolph (Fire Alarm System), JHS70 (Fire Alarm System), PS (34) Electrical and audio system upgrades, PS 94Q (Paving and landscape), PS 116 (Electrical System), Park East (Fire Alarm system) 7. Consolidate Edison (Con Ed) , Bronx , NY – Scheduler : (2008) Temporary position – Working as Scheduler Duties include: Update schedules using M.S Project 2007, Creating, and Updating Master Schedules for Projects (Load Relief, Feeder Relief, and Substations), Import, and Export Projects into Excel, Adobe Acrobat, and Logging Layouts into PASS System and export it to MS Project . 8. WDF Inc , MT. Vernon, NY- Assistant project Manger: (2007) Duties Include: Main Office shop drawing, Documentations - PS99X Field Duties: Logging Submittal for projects using Primavera Expedition, Projects Documentation, daily reports using Microsoft access. Project includes all Civil, Mechanical and Electrical upgrades including fire alarm system 9. Petrojet Co., Alexandria, Egypt –Quality Control Engineer / Planning and Scheduling Engineer 1999 - 2000 Quality Control Engineer: Responsible for welding inspection, welding map and N.D.T testing, leading a group of technicians to perform inspections all over the plant areas. Pre-welding, Fitting inspection to assure that welding procedures be followed according to ASME 9 and AWS specs. 2000-2005 Planning and Scheduling Engineer Planning, Scheduling & updates, Budgeting, Progress reporting, (Client-Subs) invoicing, Resource control Strong background and understanding of the engineering skills/process, Strong problem resolution skills are proven motivation for contractors to achieve deadlines. Strong scheduling skill in MS. project and primavera P3. Reporting of critical tasks & possible solutions to senior managers/agencies made them more confident. Managed 4 year, more than $26M projects in a team for successful completion. Successfully completed all projects on time and under budget. Project Completion List: (More than $ 26M) In the following Projects provided Construction work Scheduling. Which includes – Determining detail tasks, Establishing time limits (Using Fixed duration, Fixed work, Fixed units), Establishing Constraints/Deadlines, Setup dependencies, Creating Resources, Resource Planning, Resource Allocation, Resource Scheduling in multiple projects, Resolving Scheduling Problems & Resource Problems, Tracking Progress, Recording Actual Progress, Importing & Exporting Project Information – Excel, word,, Scheduling plan & Control, Backward scheduling for long lead items/CPM, Prepare Work Breakdown structure, Prepare different types of reports according to requirement, perform project analysis, Developed/maintained detailed Primavera schedules for tracking and resources, Customizing MS Project, Responsibilities included the implementation of a monthly schedule update including narratives on work progress. Petrojet co (Petroleum Projects & Technical Consultation co) "One of the Egyptian petroleum complex" 1999-2000 (Quality Control Engineer): Ethylene Pipelines Network For SIDIKERIER petrochemicals co (Ameriya-Alexandria-Egypt) (GC: Toyo Engineering Corp.) MIDOR & MIDTAP Refinery Pipelines Network (Free Zone - Alexandria- Egypt) (GC:Technip France). Petrojet Co. (2001/2005) (Planning & Scheduling Engineer) Southern Gas Pipeline 218 KM -18" diameter ($35M) Western Desert -Egypt (Owner: Khalda-Apache Petroleum Co) South Dabba Production Facility (Mechanical-Electrical-Civil) ($30M) Western Desert-Egypt (Owner: South Dabba Petro. Co.) Bourg El arab Gas Pipelines (24", 12" Gas Pipelins) ($ 10M) Bourg El arab -Alexandria- Egypt (Owner: Gasco Petro. Co.) khalda-Apache Petroleum Co Service Agreement (Civil, Mechanical, Electrical, Pipelines) Western Desert-Matrouh-Egypt Includes the projects: Matrouh/Tarek P/L 6" 15 km,Selket /Khepry P/L 6" 12km,Umbaraka/S. Umbaraka P/L 6" 20km,Sethos #1 Duplex P/L 6" 1km Emerald/Tarek P/L 10" 20km, Shams/Salam P/L 10", 20 km, Umbarka/ Meleiha 8"/70 km,Salam New Maintnace Workshop Construction Qasr Development Project (18", 24" 142 km) Ameriya Petroleum co (Waste Water Treatment) ($ 4M) (Mechanical/Civil) (GC: Dominant Water Technology). EDUCATION 1998 B.S of Mechanical Power Engineering, Faculty of Engineering, Alexandria University, Egypt 2006-2007 Diploma of Automotive Technology - Lincoln Tech Institute - Union, NJ TRAINING Ameriya Petroleum Co Processes training 1997, Primavera and Planning Concepts (Petrojet Co) 2000 Primavera Expedition –SCA 2008 (Introduction-Change orders-Construction Management) Primavera P6 - 2009 (P6 training) Solidworks 2008- HACC 2011 CERTIFICATES 1999 Radiographic Testing Level I (Petrojet Co) APPLICATIONS MS Project , MS Excel, MS Word, MS Outlook, Primavera P3, Primavera Expedition , AutoCAD 2002 (2 dim) , Mat lab, MS Access, P5 , P6, Solidworks 2008 PROGRAMMING LANGUAGES FORTRAN, Basic
Lancaster, Pennsylvania, United States
Karl Keczkemethy - Freelance Article Writing & Creative Writing
0
Kudos
3.5
2 Skills
Ask
Rate/Hr
I am a college grad with degree in kinesiology (biomechanics) with independent study in literature and music. I have been writing most of my life and am looking for any and all level entry writing positions. I am currently working on a book on ego and creating a blog for open philosophy and discussion. My education as for as writing goes includes courses taken in creative, technical, and business writing. I have also taken courses on English and American Literature as well as upper level grammar and basic writing. I have co-written a few plays for local theater and a few scripts for local film; I also have written and composed two albums (music) for local purposes. I prefer creative writing and hope to work freelance for a variety of subjects and needs.
Springfield, Missouri, United States
Jonathan Guerrero - Freelance Video Production & Videography
0
Kudos
5.0
2 Skills
$20
Rate/Hr
Lucent Media Group, LLC is a multimedia company based out of Cedar Rapids, IA founded in March 2010. As the owner and founder I bring over 20 years of experience as a professional musician, cinematographer, editor, director I've also been a pioneer in successfully creating the first Motion Picture Guild servicing the Eastern Iowa Corridor connecting Cedar Rapids and Iowa City. The Cedar Rapids Motion Picture Guild has been a vital resource for filmmakers in Eastern Iowa who want to expand their networks while learning and improving their craft in a safe educational environment. Though I was mentored into a broadcasting career at an early age, I soon found my calling as a filmmaker and since then have never looked back. My greatest joy comes from creating a stunning visual/auditory experience that educates and entertains minds, then observing how people react as a result of that experience. Lucent Media Group was founded with a vision of applying the best talent and resources towards projects with a noble purpose. Our motto is to illuminate the human spirit. This is a calling and a direct challenge that motivates us to do our best work for you or your clients.
Cedar Rapids, Iowa, United States