Freelance Brochure Designers : Bend, Oregon

Category
Skill
Country
Region
City
Keyword

For Freelancers

  • Create an awesome portfolio to showcase your talent.
  • Rub elbows with the web's most talented freelancers.
  • Earn money doing what you love to do.
  • And much more...

For Employers

  • Post your freelance job in just 30 seconds. It's free!
  • Instant access to the web's most talented freelancers.
  • Hire an unlimited number of freelancers.
  • And much more...
 Freelancers 
 Portfolios 
 

Search Results

  Portfolios   Sort
Tracy Anderson - Freelance Graphic Design & Brochure Design
1
Kudos
5.0
2 Skills
Ask
Rate/Hr
Qualification Profile Highly creative and multi-talented Graphic Designer with extensive experience in marketing and print design. Effective and positive team player known for contributing effective, creative solutions as well as technical ability. Able to embrace constructive criticism, fast diligent learner, detail oriented in order to maximize effectiveness of the final product while...
Bend, Oregon, United States
Samantha Jackson - Freelance CD Design & Brochure Design
1
Kudos
3.5
2 Skills
$45
Rate/Hr
I'm a photographer / artist I've been doing art and photography sense I was a kid. Webpages are; www.Facebook.com/wildfeatherphotography Www.wildfeatherphptography.weebly.com
bend, Oregon, United States

More Freelancers

Peter Melonas - Freelance Comic Art & Illustration
11
Kudos
4.0
2 Skills
Ask
Rate/Hr
Peter Melonas has established a lengthy and varied artistic career in screen printing, as an illustrator and graphic designer. This commercial artist's popularity began with creating an imagery of characters from the mystery genre. Time after time, his name comes up quite often in search of a particular detective wearing a deerstalker cap. He has shown his artistry of Comics & Superhero drawings in retail comic stores throughout the Mid-South. http:www.ebay.com/usr/fancifullartmelonas Peter has participated in many art exhibitions, Wizard World Comic Cons and juried show events. At a youthful age, first it was the fascinating comic book art that caught my attention, and then, he began to read the stories. Wham! Bam! Pow! Artists draw on their predecessors in ways that make each work a very personal history of art. They build on the works of the past, either inspired by or reacting against them, but always challenging them with their new creations. One of Peter’s early influences was Thomas P. Gill, an American comic book artist, best known for his nearly 11-year run drawings of The Lone Ranger. Peter is a freelance artist who is always looking to collaborate on a commissioned project ( specifically comic book covers, characterizations & illustrated collectibles )
Cordova, Tennessee, United States
KBoulter - Freelance Editing & Legal Translation
0
Kudos
4.0
2 Skills
$25
Rate/Hr
I am a Florida Registered, Certified Paralegal. I can assist in filing forms, navigation of the court systems, and translation of legal documents. **I AM NOT AN ATTORNEY; AND THEREFORE CANNOT GIVE LEGAL ADVISE** I am a notary for the State of Florida and I have a proficient to advanced knowledge of Family Law, Bankruptcy Law, and Civil Law. Additionally, I am an excellent support staffer by being advanced in all Microsoft and Mac applications.
West Palm Beach, Florida, United States
Tamara Hall - Freelance Graphic Design & Fashion Illustration
22
Kudos
3.0
2 Skills
Ask
Rate/Hr
Tamara Hall 1102 E. Deerfield Lane Colbert, WA 99005 (509)475-3972 tshall3@live.com Education: Washington State University, Pullman, WA - August 2006 - May 2010 B. A. Apparel Design and Apparel Merchandising Fine Arts Minor Cumulative GPA: 3.67 *** Laude Skills: Flat Patterning, Draping, Fashion Illustration, Photoshop, CAD, SharePoint, Microsoft Word, Excel, and PowerPoint. Experience: Sales Associate, Bath and Body Works; Spokane, WA - 2011/current - Worked as a cashier, customer service associate, and merchandiser. Internship with Zandra Rhodes; London, UK - 2010 - Designed apparel and textiles, pattern making, painting, sketching, etc. Sales Associate, Macy’s; Spokane, WA - 2008/2010/current - Worked in multiple departments as a cashier, merchandiser, and customer service associate. Head Lifeguard and Swim Instructor; Spokane County, WA (seasonal) - 2007/2008/2009 - Kept children safe, scheduled, taught lessons, performed water tests and maintenance. Assistant Manager/Lifeguard/Swim Instructor; Deer Park, WA (seasonal) - 2005/2006 - Assisted the manager, supervised, scheduled, cashiered, performed maintenance, taught, etc. Honors and Awards - President’s Honor Roll - 2006/2007/2008/2009 - Member of Kappa Omicron Nu Honor Society - Work displayed at Apparel, Merchandising, Design and Textiles Student Showcase - 2009 - Undergraduate Research and Creative Project Grant Funded - 2008/2009 - Designer Exhibiting Collection at Fashion Show - 2009/2010 - Published in Washington State University’s Connections Magazine 2009 - Design accepted for exhibit at ITTA (International Textiles and Apparel Association) - 2009/20010 - International Juried Exhibition, Bellevue, WA - 2009 - International Textile and Apparel Association Undergraduate Design Award: Eden Travel - International Travel Award for Internship with Zandra Rhodes - 2009 - Dean’s Honor Roll - 2010 - Outstanding Senior of Washington State University - 2010 - International Juried Exhibition, Montreal, Canada - 2010 - Designs accepted in Emerging Designers - 2010 Volunteer Experience Modeled for Mom’s Weekend Fashion Show - 2008 Met for fittings, runway practice, and meetings. References: Dr. Carol Salusso, Associate Professor and Advisor, (509) 263-9113, salusso@wsu.edu Dr. Yoo Jin Kwon, Assistant Professor, (509) 335-7452, y_kwon@wsu.edu Dr. Catherine Black, Associate Professor, (509) 335-8909, cmblack@wsu.edu
United States
Luis Blanco - Freelance Illustration & CAD
1
Kudos
5.0
2 Skills
Ask
Rate/Hr
Luis Blanco 5020 Glenscape Trl. Mobile: 469-279-3696 Fort Worth, TX 76137 Email:LuisBlanco1980@yahoo.com OBJECTIVE: Obtain a challenging position in where I can further myself professionally, and my design skills can contribute to your company. EDUCATION:ITT Technical Institute Graduated:September 2008 Degree: Associate of Applied Science Field: Computer Drafting and Design CAD TOOLS/TECHNOLOGIES: Drafting: AutoCAD 2009, Architectural Desktop 2009, Autodesk Inventor 2009, Phototop 2.83 Graphic Design: Photoshop CS3, Adobe Illustrator Office Tools: MS Word, MS Excel, MS Office Suite, Quick Books 2008. Relevant Courses: Architectural Drafting, Elevations, Sectionals, Scaling, Electrical, Engineering, Floor Plan Layouts, Dimensioning, 3D Presentation & Renderings, Mechanical Tolerances, Bill of Materials, Assembly Drawing, Working Drawing. PROFESSIONAL EXPERIENCE: Staffmark (Ft. Worth, TX) March 2010 – Current Shipping Processor/Driver Drive forklift to pull orders. Pull product according to custom order. Label and scan all product serial codes to prepare for shipment. Weigh and inventory prepared products through UPS/FedEx shipping system. Track and log all shipments and billing manifest. Hollywood Video (Dallas,TX) September 2009- April 2010 Shift Lead Open and manage client accounts. Receive, transfer merchandise, price inventory according to corporate request. Manage and track store funds and recollection documentations. Alpha Granite & Marble Inc. (Dallas, TX) July 2008 – March 2009 Drafting Technician Alpha Granite & Marble Inc. specializes in manufacturing natural stone, granite, and marble products such as Floors, Countertops and Custom Designs for residential kitchens/bathrooms, as well as commercial businesses. Responsible for production of assembly, working, and 3-D models of custom products. Created cost estimates for clients that accounted for material, templates, and labor installation. Responsible for procurement of materials from a variety of vendors. Performed quality assurance checks and parts audits to verify material and model correctness. Collaborated with builders, production personnel, installers and contractors to ensure project success. Produced complete drawings with specs on material, dimensions, layouts, floor plan, and detailed templates for production and installation. Wal-Mart (Highland Village, TX) September 2007- July 2008 In-stock Team Keep product stocked and kept track of inventory. Prepared displays for product features. Organized and maintained backroom storage. REFERENCES AVAILABLE UPON REQUEST
Fort Worth, Texas, United States
Shaunte stone - Freelance Resume Writing & Proofreading
0
Kudos
3.5
2 Skills
$20
Rate/Hr
Shunta Weatherspoon Centerville, OH 45459 937-716-1724 Cocoastone38@outlook.com Seeking a Federal position, Business Analyst Consultant or a position as a Legal Consultant in a thriving organization that requires my knowledge of consulting, a high aptitude, and tough commitment can effectively contribute to the successful and profitable operation of the firm. Borderlinx Human Resources- Distributor June 2016-Present The job is a work at home position. My duties are to process company packages. The packages are inspected, and have written reports on the packages are received. My duties are to print the labels sent to me in email, and ship to the customer. I communicate with the manager regarding the daily task. Xenia Transcription Word processing Services – Self Employed June 2014-Present I typed different types of documents at the request of individuals and companies We type for everyone including students who are in high school, college, etc Computer IT Henkels and McCoy June 1995- August 1996 I typed different types of documents at the request of individuals and companies We type for everyone including students who are in high school, college, etc Substitute Teacher Windham Public Schools December, 1998 - September, 2003 My duties were to perform the responsibilites of the staff in the classroom when absent. Colorado Technical University Online Colorado Springs, Colorado June 12th, 2011-August 2013 Criminal Justice Degree Everest College Phoenix online Associates, Criminal Justice January 2010-january 2011
United States
Julianne Bonnell - Freelance Photo Editing & Event Photography
1
Kudos
4.0
2 Skills
$120
Rate/Hr
Julianne Bonnell jbonnell@falkschool.com jkhbonnell@yahoo.com 716-239-0817 (mobile) 83 Tulane Rd Tonawanda, New York 14217 ________________________________________ OBJECTIVE To obtain part time time employment that utilizes my interpersonal skills, organizational skills, work ethic and knowledge gained throughout my education and experiences.________________________________________ WORK EXPERIENCE Teacher Aide Stanley G. Falk School 31 Rossler Ave, Cheektowaga, NY 14206 February 2013-present I am a aide in a 7th/ 8th grade science classroom that is 6:1:1 for emotionally disturbed and lower functioning children. Responsibilities include taking attendance, checking in homework assignments and helping students with work they do not understand. I also create and modify morning work for them to complete during homeroom as well as charts, tools, and definitions to set them up for success on their assignments. Throughout the day I often work one on one with the students who have different needs, and learning styles. I make additional modifications to homework assignments assigned in other subjects to better meet the needs of my students. On a daily basis I establish and reinforce positive working relationships with all students. Mentoring, coaching and training my students to develope appropriate social behaviors such as showering and being polite, are a huge part of my job. I always model and practice sensitivity, fair treatment and acceptance of diversity in all interpersonal interactions. I use the Windows 7 and 8 operating systems, Microsoft Word, Excel, Office, Internet Explorer and Mozilla. DJ Trivia Host Easton Entertainment Various establishments in WNY November 2012- Present I facilitate a trivia game four nights a week for two hours each on a weekly basis. I establish relationships with my trivia players and establishment staff. I download the trivia games, register teams, keep track of team scores, resolve conflict, and ensure all rules are followed. I also create my own playlists. I utilize the AMPS program and DJ trivia program, a mixer, HMDI and Standard converters as well as a microphone and speaker. Fan Photographer Brand Affinity Technologies February 2013-June 2013 I utilized a Nikon camera to take pictures of fans entering the arena, watching the game, and visiting with Sabre Tooth during all home games. Custom service and a friendly disposition were crucial to the job. Retail Ralph Wilson Stadium- Delaware North September 2012-January 2013 I worked in a retail fan wagon and then in my own kiosk during Bills home games. I took inventory, utilized the credit card machine and cash register, maintained my merchandise and kiosk, counted down my drawer and turned in my profits to the office at the end of the day. Nanny February 2010 - September 2012 Attea Family I raised two children, taught them their ABC's, colors, shapes, numbers, to count, shapes, manners, how to act in public and potty training.I planned activities and art projects that were developmentally appropriate, as both were developmentally delayed. During this time I also baby sat a set of twins and another family’s two children. Teacher assistant then Center Assistant then Lead Toddler Teacher September 2006 - February 2010 Doodlebugs! As the Center Assistant I planned center wide events, attended and facilitated staff meetings and training. I opened and closed the center, created the work schedule, and managed the center and staff. I maintained staff overtime and training and team building. I provided prospective parents and students tours of the facility, promoted the center and our curriculum, planned field trips, and maintained strong professional relationships with the parents and children. I utilized Microsoft Office, Word, Excel, Power Point, etc. I also answered multi line phones and set up tours of the center. I implemented and modified curriculum as an assistant/teacher, managed my students and assistant and maintained communication with parents. ________________________________________ EDUCATION Master's Degree, Elementary Education, August 2010 - present Medaille College | Amherst, New York ( 3.5 GPA) Student taught in a first grade public school and a fifth grade Catholic school Bachelor's Degree, August 2004 - August 2008 University At Buffalo | Amherst, New York Anthropology major (3.0 GPA) overall undergrad GPA 2.7 High School September 1999 - June 2004 Oswego High School | 2 Buccaneer Blvd Oswego, New York Majored in French, Spanish, English, history, science. Graduated with a baccalaureate diploma and with honors________________________________________Professional References Mark Blesy- Principal Stanley G. Falk School/ CFS availavle upon request) 31 Rossler Ave Cheektowaga, NY Michelle Askew- Teacher I work with 716-450-1313 Stanley G. Falk School/ CFS 716-894-3892 31 Rossler Ave Cheektowaga, NY Sean Sullivan-former Vice Principal Stanley G. Falk School/ CFS available on request 31 Rossler Ave Cheektowaga, NY Jennifer Attea- was a nanny for 716-994-1012
Rochester, New York, United States
Frank Olivier - Freelance Drafting & CAD
0
Kudos
5.0
2 Skills
$45
Rate/Hr
nr Mechanical, Structural Designer - Project Coordinator - Project Engineer • Professional offering over 24 years of experience ranging from Project Coordination to Design in Process Plants, Industrial Buildings and Mining • My Golden rule: To take the Imposable and meet the Project Design requirements keep it with in Schedule of the Process Plant Life Span, bring the Project Under Budget and meet all projects meets all OHS requirements. • On Site and Office Environment experience, working on Multi project and workloads and Proven ability to Cope with High Volume of Pressure. • Project Management and Proven skills in Result-Driven and Motivation and Team Leadership, with strong and Decisive Operations Leadership, Loyal and Professional, Ethical, Honest Excellent in Deceive Decision Making, Honest and Dependable. • Time Management, Planning and Scheduling of Workloads, Strong Communication and High Level of Problem Solving, Technical skills and Report Scope of works writing and Able to take on New Challenges. • A committed Team player, able to work as a Team member or on my own initiative with Minimum Supervision in a Office, Workshop Fabrication and Site Construction. • Pro-active, goal oriented with excellent attention to detail. Positive Attitude towards my Fellow works, Team focused, Problem Solving, Results and Objective Driven. • Commented to Organisation Providing Quality Service to Internal and External Clients and ongoing Personal skill and Development Training Program. • Drawing on my past Experance to Meet all Requirements to meet Technical Managemet and Drawing Office Procedures, the use of Project Standards and all required AS/NZ code for each discipline • Excellent customer focus and able to consistently meet client’s needs. • Effectively manages change to work tasks and the work environment, and assists others with adapting to change. • Able to identify issues, problems and opportunities; make timely decisions; develop appropriate and innovative solutions; and ask for assistance if required. • Excellent verbal and written communications skills, including the ability to convey information and ideas to individuals and groups, and make presentations when required. • Demonstrate initiative and a willingness to learn and continuously improve on performance. • Able to work effectively in small to large multi-disciplinary teams, and share and transfer knowledge within teams. • Creating work packs for large and small bore pipe; i.e. pipe supports, piping routes and required material take offs onsite or located in main office. The use of 3D models and P & ID’s and mechanical and structural steel layouts to complete a work packs. All piping routs are laid out to meet safe installation and keep cost down. Includes pipe spool length for safe installation. » Education Diploma of Business (Front Line Management) Associate Diploma in Civil Engineering Process Piping Design » Skills Applications Microsoft Project Professional Release 2013 Microsoft Office Professional all relevant software Microsoft Office SQL Server 2000 Database AutoCAD Release: Dos 12 to Win 2015 AutoCAD Advance Steel 2015 Autodesk MEP 2015 AutoCAD Revit Structure 2014 & 2015 AutoCAD Revit MEP 2014 & 2015 AutoCAD Navisworks 2009 to 2015 Auto plant 3D Piping series 5 & 6 Pro Cad Piping 2D /3D Smart 2010 Bentley Pro-Steel v8i select series 6 Bentley Auto Plant P & ID Auto Turn Release: 6.0 Micro Station v8i Bentley OpenPlant Modeler V8i » Work Experience Brightwater Engineering (Perth) Snr Mechanical Designer AutoCAD 2015, Navisworks Manage 2015 August 2014 - September 2014 Yarraville Slage Grinding Mill Project Contracted to bring the Project in Under Schedule and Under Cost with Good Engineering practice, 3D Design using AutoCAD and Navisworks to complete Design Reviews and Clash Detection. The design composed three sag mill feed chute feeding one conveyor. Two of the chute require chute to capture any steel fragments which will be picked up by two magnets. These to chute require to be directed away from the head chute to the recycle bins located on the floor level. Complete some miner back drafting 3D model was used to design check for clash detection and cut sections and elevation for detailing. All three chute composed of the same head chute and each discharge chute were design to meet the material flow rate on to the conveyor at a 9 degree angle. With Good Engineering practice and 3D design and Clash Detection the time spent kept the Project ahead of schedule. August 2013 - August 2014 Home renovations using AutoCAD and Navisworks software to complete a 3D models to complete design tiling, BBQ area and decking frame and decking boards, brick and carpentry work. Installation of two 5000l and 1100 l of rain water tanks and single water pump, which included the reticulation P & ID and piping layout including transfer pipework between main storage and operation tank, the design composed of using one pump to complete the following: use for reticulation and transfer of water. All designs included BIM for MTO take off to manage budgets and trade running (if required to complete any work) costing and shorten construction time down. Current working on the roof design to cover outdoor setting and BBQ area. All design meet required Drafting and Australian Standards and a complete set of design and construction drawings. June 2011 - August 2013 Ausenco Minerals & Metals Snr Mechanical Designer, Project Coordinator AutoCAD 2013, AutoCAD MEP 2013, Navisworks Manage 2013 & Pro- ProSteel June 2011 - June 2013 Kazakhmys Bozshakol Copper Project Working out of Perth to Project Coordinator Mumbai office taking a project which was at 30% complete and issuing it for 100% complete for construction over 16 months. Issue of drawing deliverables and tracing of all deliverables issued at different stages of the project, and tracking Hold Register, Vendor data. Running schedules on all drafting deliverables and man-hours on the design areas been worked on by the Mumbai Office. working with Multi disciplines on workloads, meeting schedules, budget hours and Strong Communication and High Level of Problem Solving, Computer Software followed the improving of Technical skills. Maintain a Positive Attitude into the working environment while working remotely, Keep the Team focused on the design, Problem Solving as problems come to hand. Planning, directing, coordinating and managing the activities design, personal groups assigned to small battery limits. Project coordination of multi-disciplinary project teams, and progress reporting. Reviewing engineering and design schedules, man-hour budgets and controls. Project meets technical documentation such as specifications, flow diagrams and plot plans. Monitoring multi-disciplinary designers progress on assigned project. Assuring compliance of engineering effort to project schedule, Weekly project update to company management and owners. Working alongside Perth and Mumbai designers on a Reclaim Tunnel design and Copper Concentrate load out building, to complete 3d models to extract 2d drawings. Working alongside Designers and Snr. Engineers to meet the schedule. Insuring that all design work meets required Project and Australian Standards, and meet budget requirements, Detail up drawings for elevations & section drawings, extraction fans inlet and outlet connection and conveyor systems layouts located under collectors and changing design by drawing up a and 3d model on the process system. The extraction of 2D layouts from the 3D models “HVAC, piping, mechanical equipment and air and electrical cable trays” for shop fabrication drawing and bill of materials. Inputs came from existing Engineering manual drawing and site sketches, and 3D modelling from clash detection software. The Checking of pipe supports, access platforms, stairs ladders and HVAC and all new conveyors, bins and cutes and managing progress drawings, which included piping, HVAC duct drawings, batch hoppers, material take offs and all project drawings for the release for construction. Using life 3d models plate work, steel work to generate 2d layouts, Plans, Sections and Elevations in Pro-Steel 2D section for design and vendor issue. This includes working with Mechanical and Pro-Steel Engineers to complete design and include changes. Using Navisworks to complete Design Reviews and clash detection for all disciplines and changing the design meets the project design and standards. The issue for match up images to design personal to incorporate design, clash detection or new vendor/suppler data. Reviewing of all Pro-Steel , piping mechanical design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s. Checking of work packages and marking up information and returning for update and issue under the current revision. Weekly update and drafting deliverables and progress reporting. Updating cad systems and supporting personal in the use of pro-steel. The use of Pro-Steel to give live design changes but plate work and steel MTO’s. Ausenco Mumbai – India Tucano Gold Mine Working out of Mumbai office taking a project which was at 15% complete and issuing it for 100% complete for construction over 6 months. Working with Perth and Mumbai designers, drafters and Snr. Engineers to meet the schedule. Weekly update and drafting deliverables and progress reporting. Checking of all Pro-Steel design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s and piping isometric’s. Using life 3d models plate work, steel work to create layout, sections elevations in Pro Pro-Steel Auto-plant to create life 2D section for design and vendor issue. Weekly update on Project Design and drafting deliverables and progress reporting Using of Naviswork 2013 for clash detection , design review and design progress and vendor data review. Updating cad systems and supporting personal in the use of Pro-Steel and Auto Plant. The use of Pro-Steel to give live design changes but plate work and steel MTO’s. Drawing on past Experance to help with Training Engineers and Draftsmen to meet Australia Standards and Document Control Procedures. Intrudes a Positive Attitude into the working environment, Maintain Team focused on the design, Problem Solving as problems come to hand. Planning, directing, coordinating and managing the activities design, personal groups assigned to small battery limits. Project coordination of multi-disciplinary project teams, and progress reporting. Reviewing engineering and design schedules, man-hour budgets and controls. Project meets technical documentation such as specifications, flow diagrams and plot plans. Monitoring multi-disciplinary designers progress on assigned project. Assuring compliance of engineering effort to project schedule, Weekly project update to company management and owners. Setting up the next process data transfer and design process to meet all project and design process to be issued to Ausenco Mumbai, Remote Office (Mumbai) experience back to Perth , working with Multi disciplines on workloads, meeting schedules, budget hours and Strong Communication and High Level of Problem Solving, Computer Software followed the improving of Technical skills Projects: Kazakhmys Bozshakol Copper Project (1.9 Billion) Bozshakol Clay Project study (120 million) Tucano Gold Mine (110 million) Matrix Composites & Engineering Snr Mechanical Draftsmen & Project Engineer AutoCAD 2009, AutoCAD MEP 2010, Navisworks Manage 2010, Pro-CAD 3D Smart & Pro-Steel May 2010 – May 2011 At Henderson feasibility Design layouts of piping systems stainless steel tube and Sch 80 pressure process systems and Pro-Steel platforms, and plant access , pipe systems and conveyor bridge linking to storage silo’s. Using of Navisworks for clash, design review and design progress for vendor data review and work progress complete. Responsible for preparing and reviewing, design drawings and other information. Supports construction and procurement with preparation of drawings and material take offs. Reviews drawings and assists with collection of design information required by construction and procurement. Incorporating engineering practices, design details, international codes and standards, procedures and specifications. Directly involved with development, enhancement and maintenance of 3D graphic visual display and modelling work. 3D modelling of new plant, detail pipe & tube layouts, isometrics a Pro-Steel drawings on elevations & section drawings, design 3d model on the high pressure process system. 3D Model layout on high pressure process and all steel work and high presses pipe and tube feed conveyor systems, and piping system covered oil and resin. Design layouts of process and Pro-Steel working platforms, pipe/conveyor Bridge. Checking of vender deign and drawings piping and tubing and Pro-Steel steel drawings, material take offs for construction. This includes checking P&ID’s, Plant layout, 3D modeling of the plant and Pipe work using 3D SMART Procad pipe. Using Prosteel to 3D Model all steel layouts to complete pipe & tube runs and tube feed conveyors. Using Naviswork 2010for design review and clash detection Overseeing the Fabrication and Installation and of all low pressure Tube system (900kPa) process room and high pressure piping (sch80 RTJ valves /flanges) system (1700kPa) piping in the main process building. Coordinating work packages and the writing up work area scope of work and review proposal packages. Fabrication of 8 off, 60 000liter storage tanks and installation. Writing up tender documents to the high and low pressure process and steel platforms, walk ways for fabrication. While meeting project schedules, and procure tube, valve and fittings. While under construction working with tube and high pressure pipe fitter and boiler makers. Following up on steel fabricator and equipment installers. Updating and meeting project schedule and completing work before schedule outlined. Any design changes met strict process to stay within piping P & ID’s with approval from process engineer and project manager. Responsible for scoping, planning, directing, coordinating and managing the activities design, site installation personal groups assigned to small battery limits. Estimating of piping, Pro-Steel and tanks to let contracts for fabrication, project coordination of multi-disciplinary project teams, and progress reporting. Developing a definition of the scope of engineering services to be provided by the company. Reviewing engineering and design schedules, man-hour budgets and controls. Approving all project technical documentation such as specifications, flow diagrams and plot plans. Monitoring engineering expenditures and progress on assigned project. Assuring compliance of engineering effort to project schedule, control estimates and company procedures. Weekly project update to company management and owners. Commissioning Engineer Overseeing construction process to meet client design and process design and that plant meet Australia standards from a construction, commission and maintenance while under production. Checking of all vendor data and checking all design data to all process data before any commissioning takes place. Checking and all pipe lines, fixing and confirming it meets the design process. Training site personal once the plant is commission has taken place after the first 100 hours. Project: New facility in Henderson ($ 32 Million) Tiwest Joint Venture Snr Mechanical Designer AutoCAD R 2009, AutoCAD MEP 2010, Navisworks Manage 2010 & Pro-Steel April 2009 – April 2010 On site Chandala for the design RI recovery operation and conveyor to replace of existing RI recovery hopper and conveyor. This included accessing existing building and road way and existing drainage. The design included mechanical layout front end loader access to 40t hopper and new conveyer. Updating of Process Flow Diagrams and Piping and Instrumentation Diagram, site plan update and generate a set of mechanical layout and section drawings to match design change. The design included Hopper design, concrete bunker and conveyor with tail and head chute feeding into 8” (203mm sch80) pipe work and isolation valves into a hot bin with bypass system to feed into conveyor system. Civil layout for conveyor and hopper drawing for foundations. Checking and red lining of design drawings for the following disciplines, Mechanical, Pro-Steel , Piping and civil Drawings for 23klt Activated Carbon Process and re-issuing back to EPCM. This included checking design of two existing Pro-Steel , pipe work and location of mechanical equipment’ i.e. conveyor head and trail chutes, Pro-Steel and piping levels’. Layout on a 54 meter long x 35meter wide Activated Carbon storage shed to access with B-trains and forklifts. Design included B-train turning circles and drainage to the building. At Kwinana feasibility study Design layouts of process to introduce Lime process to replace existing Limestone process in area 600. Tanks, pumps, hopper and conveyor. Updating Lime PFD & P &ID’s to include into lime stone into existing Lime process. Plant layout to include storage tanks, conveyor and low level feeder including pump layouts. Included in the design for front end loader, semi-trailer turning circles. Pro-Steel stairway, working platform and ladder access to tanks and actuators. Mechanical feed hopper, discharge chute and pipe layouts for pumps. Project: Kwinana Feasibility Project (Congo) (5.5 Million) Chandala RI Recovery ($ 25 Million) Ausenco Minerals & Metals Snr Mechanical Designer Draftsmen AutoCAD R 2008. October 2008 – November 2008 Design layout of process Tanks, pumps and CCd’s to match PFD process and size of equipment match data sheets. By producing plan, elevation and section drawings for design review for costing. Process plant layout for the following process areas Copper leach circuit, CCD thickeners, Reflux thickening and clarification, cobalt leaching circuit Sulphur dioxide absorption process. Checking of layouts on each battery limit to make sure all piping and Pro-Steel will be located in the right location once we move into detail design in the all areas. All drawing meet the required drawing office procedures to meet all required AS/NZ codes. Project: Mutanda Copper Project (Congo) ($ 1.1 Billion) Worley Parsons Hydrocodone’s Snr Piping Designer – AutoCAD R2005 – Auto Plant 3D Piping & Pro-Steel June 2008 – October 2008 3D modelling of current and future plant, detail pipe layouts, isometrics a Pro-Steel drawings on elevations & section drawings, design 3d model on the process system. Checking of drawings piping, Pro-Steel steel drawings, material take offs for construction. This includes checking P&ID’s , Plant layout, 3D modeling of the plant and Pipe work using Autoplant. Using Prosteel to locate existing and future steel layouts to complete pipe runs. Checking all pipe routing, Material take off and Item listings and all drawing meet the required drawing office procedures including all AS/NZ codes. On site checking piping routes and structral pipe supports, rack, including civil works for new designs. Project: BP refinery Kwinana ($ 11 Million) Bateman Engineering Lead Designer – AutoCAD R 2005 – Auto Plant 3D, Pro Pro-Steel . June 2007 – June 2008 Responsible for scoping, planning, directing, coordinating and managing the activities design, site installation personal groups assigned to small battery limits. Estimating of piping, Pro-Steel and tanks to let contracts for fabrication, project coordination of multi-disciplinary project teams, and progress reporting. Developing a definition of the scope of engineering services to be provided by the company. Reviewing engineering and design schedules, man-hour budgets and controls. Approving all project technical documentation such as specifications, flow diagrams and plot plans. Monitoring engineering expenditures and progress on assigned project. Assuring compliance of engineering effort to project schedule, control estimates and company procedures. P & ID, PFD & 3D model, detail pipe, civil & Pro-Steel drawings on details, elevations & section drawings, design 3d model on the process system. Working with alongside designers, drafters and Snr Engineers to meet the schedule. Weekly update and drafting deliverables and progress reporting. Using life 3d models plate work, steel work to create layout, sections elevations in Pro-Steel Auto-plant to create life 2D section for design and vendor issue. Checking of all Pro-Steel design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s and piping isometric’s. Using of Navisworks for clash, design review and design progress and vendor data review. Managing all progress, included piping, Pro-Steel steel drawings, material take offs and all project civil drawings for the release for construction. This includes checking P&ID’s , Plant layout, 3D modeling of the plant and Pipe and ProSteel work using Autoplant pipe and prosteel. Checking all pipe routing and material spec’s, including all ProSteel steel plate (Prosteel) between crushing and grinding and overland convoyer to the leach pad . ProSteel for the pipe racks, CCD’s tanks pipe supports and access platforms and all drawing meet all drawing procedures and meet all required AS/NZ code on each discipline, stairs. Checking all Material take off’s and Item listings. On site civil works construction and design, checking of levels. Setting up of AutoCAD Menu systems Title blocks, plot styles. Including a adding a continuous improvement plan in maintain Cad systems, Auto plant and drawing office procedures to meet all required AS/NZ code on each discipline. Project: Muliashi Copper Project ZAB710 (Zambia) ($1.25 Billion) HPS Environmental Enerflex Lead Draftsmen – AutoCAD R 2005 - Micro Station V8 August 2006 – June 2007 Manage of drawings schedules for Design of water and clean & dirty air extraction system, drawings P & ID, Isometrics and PFD, detail pipe drawings on elevations & section drawings, extraction fans inlet and outlet connection and conveyor systems layouts located under collectors and changing design by drawing up a and 3d model on the process system. The extraction of 2D layouts from the 3D models “HVAC, piping, mechanical equipment and air and electrical cable trays” for shop fabrication drawing and bill of materials. Inputs came from existing Engineering manual drawing and site sketches, and 3D modelling from clash detection software. The Checking of pipe supports, access platforms, stairs ladders and HVAC and all new conveyors, bins and cutes and managing progress all HPS drawing office and contractor drawings, which included piping, steel duct, Pro-Steel drawings, batch hoppers, material take offs and all project drawings for the release for construction. Setting up of AutoCAD Menu systems Title blocks, plot styles. Including a adding a continuous improvement plan in maintain Cad systems and drawing office procedures to meet all required AS/NZ codes and disciplines. Project: Tom Price DCB upgrade ($ 1.5 Million) BHP Mining Area C ($ 12 Million) BHP Yandi Expansion Project ($ 10 Million) Wesfarmers Kleenheat Gas Drawing Office Supervisor/CADD Manager AutoCAD 12 - 2007 July 1995 – August 2006 Design of Major Storage Facility, Automotive gas (autogas), Industrial and Commercial LPG installations. A thorough Knowledge on the required AS/NZ codes for the Design of LPG / LNG gas installations and storage felicities and maintaining a high level of safety at all times in the design process. Participate in design reviews, advice on technical design and drafting issues and compliance requirements as appropriate. Working alone side and overseeing all designs drawings from sketches, notes, plans, piping specifications to produce accepted designs for best practice and company process. Checking of all site layouts, in piping and routs, structure supports, ladders, stairs and cylinder storage platforms including material take offs. For the all LPG /LNG installations “bulk storage, road transport, fuel stations and industrial installations around Australia. To make sure all Australia standards (AS/NZ code s) are met. 2D in piping and civil layouts and designs including transferring 2D design to a 3D modelling to review design, when required. Piping layouts on plot plans, process equipment, and piping systems including (pump sets, compressors, vaporizers, boilers, pressure regulators, and pressure vessels, unload and load facilities). Detail design on mechanical equipment, drawing up of P & ID’s and producing piping designs and layouts from P & ID’s, material takeoffs. Checking of drawing to meet all require to local Government and Australia standards to meet the installation and operation process. Setting up of AutoCAD Menu systems (drop down menu, tool bars, dynamic blocks) to include the following Autogas, Industrial, Commercial, Standard symbols, LPG & LNG facilities, LPG & LNG P & ID’s, 2D and 3D piping fittings, fire protection systems, Gas reticulation systems, Pressure vessel layouts, Title blocks, steel sections and details. All blocks – symbols to transfer data to a database to extract material list from drawings. Including a adding a continuous improvement plan in maintain Cad systems and drawing office procedures to meet all required code and disciplines. Implementation setting a Drawing and GIS registers and numbering system to work from an intranet system to record, view, AutoCAD, AutoCAD Volo View drawings, PDF Documents (Projects, Road Tanker Records and LPG and LNG facility Specifications and documents), including MapInfo Maps, Gas reticulation systems and analyst maps. Rolling out of using AutoCAD Volo View and MapInfo Pro viewer to view drawings and maps thorough out Australia. Implementation of AutoCAD Map and MapInfo GIS software for company gas reticulations systems and analyst maps. Setting up an operating system, procedures and standards to meet company procedures and compliance. Projects: Current Projects Nowra Gas Storage Facility – Nowra (N.S.W) ($ 1.25 Million) Proposed LNG Heavy Vehicle Refuelling ($ 1.75 Million) LPG Projects: 1994 – 2006 Project Manage office building maintains – Murdoch office (W.A) ($ 20 Thousand) Project Manage office building maintains – Myaree office (W.A) ($ 10 Thousand) Armidale Gas Storage Facility (Mott St) – Armidale (N.S.W) ($ 1.5 Million) Swan Hill Gas Storage Facility - (S.A) ($ 75 Thousand) Bulwer Island Gas Storage Facility - Pinkenba (QLD) ($ 3.5 Million) Darwin (Winnellie) Gas Storage Facility - (N.T) ($ 1.1 Million) Kwinana Gas Storage Facility - (S.A) ($ 75 Thousand) Bangladesh Gas Import Storage Facility - Port Mongla - Dhaka($ 35 Million) Bulls Brook Gas Storage Facility – Upper Swan (W.A) ($ 1.2 Million) Bulwer Island Gas Storage Facility - Pinkenba (QLD) ($ 1.1 Million) Adelaide Gas Storage Facility – Winfield (S.A) ($ 1.2 Million) LPG Road Tankers Redesign ($ 20 Thousand) LNG Projects: 2000 - 2007 Armidale Gas Storage Facility (Mott St) – Armidale (N.S.W) ($ 3.5 Million) LNG Road Tankers Design (LNG-101) ($ 50 Thousand) Sands Transport - (W.A) ($ 100 Thousand ) Mitchell Transport - (W.A) ($ 90 Thousand) Deer Park - (VIC) ($ 1.5 Million) Murray Goulburn - (VIC) ($ 1.2 Million) Connell Wagner P/L Contractor ProSteel Draftsmen – AutoCAD R 12 July 1994 – August 1994 As build drawings on foundation layouts, ProSteel steel walk way updates. Project: Coflexip Asia Pacific CMS Construction P/L Contractor Estimator (Civil) May 1994 – July 1994 Estimating from Engineering and Architectural which included drawings costs on concrete, formwork, man hours, etc. Projects: BHP: Cockatoo Island Iron Ore Project Alcoa: Substations and Switch rooms CSBP: Granulation plant T & Z Architects P/L Contractor Cad/Draftsmen – AutoCAD R 12 May 1994 Project: Submarine Trainee facility (Naval Base, W.A) Transfer of manual drawings into AutoCAD. Lenny’s Commercial Kitchens Estimator / Draftsmen September 1993 – April 1994 Estimating from Engineering and Architectural which included drawings costs on floor plans for Bars and Restaurants. Planning and tracking of projects implementing workload and project register, weekly progress reports, and multi project tasking. Material takeoffs and costing on stainless steel bench tops, Kitchens appliances, food display. Backpacking though Europe on Holiday April 1993 – September 1993 Main Roads Department Carlisle, Perth W.A Contractor Civil Draftsmen AutoCAD R 11 January 1992 – August 1992 As Builds on Industrial and Commercial crossovers and drainage details. Design and details construction drawings in 2D and 3D drawings of Compensation Basin on the Token freeway. Including all sections and detail. Following up on accidents reports for the Mitchell Freeway. Progress reports on the raster transfer of Kings Park to AutoCAD. Projects: Kings Park drawing transfer Token freeway Compensation Basin Hydrocarbon Recovery Techniques Piping Designer AutoCAD R 11 January 1992 – August 1992 Process Design layouts and pipe fabrication drawings including pipe supports on oil recover units. Piping design sketches, plans, specifications and suppler data. Design skid mounted pumps and heat exchanges to be transportation. Drawing up 3D modules on plant layout on equipment. Linde AG Piping Designer AutoCAD R 11 September 1991 – November 1992 Process Design piping layouts and pipe isometrics drawings including material take offs. Overseeing of piping design and detail drawings from sketches, notes, plans, designs, specifications and data. Drawing detail design from P & ID’s and producing piping layouts. Drawing up 3D module on stage 3 plant, Moss Gas layout and equipment. Pressure Vessel detail sections and design (pump sets, compressors, boilers and load facilities). Bill of material take offs on piping systems and ProSteel steel. Setting up of Drawing register and document control system. Projects: SASOL 3 Moss Gas (60) Fuel Tanks and Pressure Storage Spheres United Construction P/L Piping Designer April 1991 – August 1991 Pipe materials take offs for Stainless and Carbon piping isometrics for shop fabrication. Setting up of recording of weld heat numbers and running fabrication reports. Issuing of working and releasing materials for fabrication. Maintaining records on pipe spools/isometric design variations and the recover of pipe fittings. Including keeping up to date with all the required specifications and progress reports. Planning and tracking of work load and all material use on project, weekly progress reports. Projects: North West Shelf Stage 3 Tub Bridge Gas Field Development Pinjar Gas Turbine Station Stage 3 Phillips Engineering P/L Henderson W.A Estimator April 1988 – August 1991 Estimating from Engineering and Architectural which included drawings costs on process plants and mining sits. Material take offs on chutes, conveyers, tanks, ProSteel steel and piping. Monitoring of fabrication of components, welding procedures and checking of ProSteel . Projects: Ocean Shipyards (workshop extensions) Mineral Sands St Ives Gold Mine United Construction P/L Contractor Project Pipe Designer & Scheduler January 1987 – May 1988 Manual drafting on revised piping isometrics and document control on Post weld heat treatment (PWHT) including NDT records. Pipe materials take offs for Stainless and Carbon piping isometrics for shop fabrication. Setting up of recording of weld heat numbers and running fabrication reports. Issuing of working and releasing materials for fabrication. Maintaining records on pipe spools/isometric design variations and the recover of pipe fittings. Including keeping up to date with all the required specifications and progress reports. Onsite running of Gantt charts, planning and tracking of project weekly progress reports on multi projects. Projects: North West Shelf Stage 2 North West Shelf Stage 2 (Domgas) December 1986 - Emigrated to Australia » Interest Landscape Photographic, gardening, carpentry, Sailing.
Perth, Western Australia, Australia
Ryan.hude - Freelance Consulting & Database
0
Kudos
3.0
2 Skills
$30
Rate/Hr
Ryan Hude 1810 Terrace Dr. Caldwell TX, 77836 Ryan.Hude@ymail.com (713)826-6770 Experience Hude GIS Solutions, LLC July 2010 – Present GIS Specialist After being laid off in January 2010, participating in many interviews, sending out many resumes and CV’s…I incorporated HGS in the summer of 2012 for the purpose of supporting my family and to become a Professional Independent Contractor. I desire a full time employment position with a replicable company that shares my idea a long term commitment and goals. I have the ability to develop and maintain new business, manage projects, complete tasks, manage personal, and provide professional support utilizing my past experiences and my extensive working knowledge of GIS and CAD mapping, Esri ArcGIS Suites, Microsoft, Word press, PHP, Cloud Servers, SaaS, python, .NET, Java, SQL, Visual Basic, Map-basic, and multiple GIS and Information Technology Software. I have 10 years experience in the Oil & Gas Industry specializing in TX DOT pipelines, HCA pipeline mapping, Environmental Analysis, Emergency Management, pipeline profiles, permitting with TRC, NPMS, POD’s, database creation, data conversion, Geo-referencing, ROW’s, Route mapping and AutoCAD. I am a team player, strive to meet time sensitive deadlines, uphold the client’s confidentiality, and will always communicate honestly. Advanced GIS Specialties’: ? GIS Analysis, AutoCAD & Project Management ? Office Management & Training ? Provide Modern Geospatial Methodologies, map editing, & data consulting business development, and lead support to my team on location and our Columbian Team in Bogotá meet deadlines accurately and punctually, while working remotely and/or in office ? Custom Mapping, Topographic , Geo-referencing, Digital Elevation Models, 3D ? Plats and Well Lease maps which includes parcel and tax data for Meeps and Bounds. ? Cadastral, Land Survey, Boundary, Calculating Distance and Spatial Accuracy are ? Land Lease, Parcel & Tax Maps, Mineral Rights, and Meeps & Bounds ? Compliance & Government regulations ? National Pipeline mapping Submittals (NPMS) ? Texas Railroad Commission Submittals(RRC) ? High Consequence Area mapping (HCA’s), alignment sheets ? Pipeline Profiles, Risk Analysis and Integrity Management ? Pipeline Open Data Model Standard (PODS) ? Database design and Management for Enterprise Databases ? Natural talent for Data Research, Data Conversion ? Research, Analyze and compile data into spatially accurate maps (ArcSDE) ? Field Data collection Software & Code: Esri ArcGIS Suites, AutoCAD , Trimble, GPS, Visual Basic, Map-basic Information Systems, Microsoft, Excel, Spreadsheets, IT, Cloud Servers, AutoCAD, python, .NET, Java, SQL, Interactive Web-mapping, Hard & Cloud Servers AMEC Paragon Houston, TX May 2006-January 2010 GIS Analyst II At AMEC my main focus was to learn as much as I could from the Global Engineering leader and to provide the most beneficial project management, GIS support and deploy the most accurate SDE’s/ geo-databases to insure quality to our pipeline managers. I managed 2 teams and the data used to create ROW’s and Emergency Route Maps for new construction and as-built pipelines. Along with coordinating the mapping and CAD drafts and data management my other responsibilities were to purchase the data sets, edit the data for Q/A & Q/C, manage the 2 team’s budget, and communicate with the clients and engineers of the pipeline project. Responsibilities: ? Analyzed and managed data for a 2 mapping/drafting teams ? Assist Engineer with quality project management support ? CAD data conversion and restoration ? Created and management of Esri GIS/ArcSDE Geo-databases for multiple projects ? Budget control, deadlines, and communicating ? Q/A and Q/C, Edited 2 teams maps/drafts and other data sensitive deliverables ? Trained other co-workers on Esri GIS software as they joined the team ? Able to make sound decisions in a fast pace environment while managing multiple projects and meeting strict deadlines Michael Baker Corporation March 2004 – February 2006 GIS Analyst II I moved back to Houston after accepting an offer from Michael Baker Jr. Corp. as a GIS Analyst I for a 2 year FEMA project. My focus was to cleanse and update FEMA’s current flood plain data, research, gather, and analyze census and spatial data based upon the area of interest’s population growth. Along with my small team we created the geo-databases, SDE’s, and GIS shapefiles we then compiled into accurate emergency management maps. GIS Skills: ? Analyzed and compiled data for the water flow of flood zones(ArcSDE) ? Analyzed and updated data using Esri, ArcGIS Suites, CAD and HEC-REC software ? Government Regulatory requirements(FGDC) ? Remote Sensing, Aerial photography, Real Time mapping ? Created easily understood maps with geospatial accuracy (SDSFIE) Geologic Data Solutions July 2003-January 2004 GIS Analyst I GDA in Denver was my landing spot after college, my key responsibilities were scanning, geo-referencing, digitizing, and editing spatial data using Visual Basic, Map-Basic, and SAS to create custom geologic datasets of the Russian Mountain Range, GDA geologists were interested in exploring for oil and gas. I gained creativity and confidence in utilizing different outside resources due to the fact a lot of the data was in Russian. Education: Southwest Texas State University (1999-2003) Bachelor of Science in Geography GIS Certified (Cartography and Remote Sensing) Advanced Principles of GIS, Spatial Data Analysis, Creation & Management Principles of Aerial Photography & Remote Sensing Map Compilation, Cartography & Graphics Geology & Mineral analysis/mapping
Caldwell, Texas, United States