Freelance Portrait Photographers : Monroe, Louisiana

Category
Skill
Country
Region
City
Keyword

For Freelancers

  • Create an awesome portfolio to showcase your talent.
  • Rub elbows with the web's most talented freelancers.
  • Earn money doing what you love to do.
  • And much more...

For Employers

  • Post your freelance job in just 30 seconds. It's free!
  • Instant access to the web's most talented freelancers.
  • Hire an unlimited number of freelancers.
  • And much more...
 Freelancers 
 Portfolios 
 

Search Results

  Portfolios   Sort

More Freelancers

Conor Hennelly - Freelance Voiceovers & Narration
0
Kudos
4.0
2 Skills
Ask
Rate/Hr
I'm a philosophy college graduate with a passion for words, from acting and vocal performance to writing. Writing takes a special eye to see the world as it is, or perhaps more than it is; I'm working on developing that. I've have collaborated in writing and producing two feature-films and several shorts films, have co-written other scripts and plays, and have a love (and a knack) for writing poetry as well. I have been asked to read commissioned poems for official university functions, and have performed in several feature-films and theatrical productions, with some training in voice.
Little Rock, Arkansas, United States
Nichole Visnesky - Freelance Creative Writing & Report Writing
0
Kudos
2.5
2 Skills
Ask
Rate/Hr
I am eager to learn and new to the scene, and hold a strong passion to become heard. I write from the heart not with my head, I often write for much longer than I intend to, I feel I can be easily molded if given some direction.
Greenville, North Carolina, United States
Melinda Lee Berry - Freelance Writing & Proofreading
0
Kudos
5.0
2 Skills
$25
Rate/Hr
I have a B.A. in French, a Master of Science in Criminal Justice as well as a Master's degree in Public Policy and Administration from Michigan State University. I also have a Homeland Security Studies certificate, have presented research before state legislature, and have taught online classes at Michigan State. I have studied abroad, worked in the Criminal Justice field, and started my own business. I can type at 60 WPM and have edited and written numerous papers throughout college and my 3.5 years as a Case Manager. I have written papers in French and have written about controversial topics such as stem cell research, planned parenthood, and the psychological consequences of terrorism, etc. I also enjoy creative writing and have had poetry published. I love doing research, proofreading and getting the information across to a specific audience. I feel I can write about anything you were to ask....so please do! Below you will find my resume of which I also have practical experience with developing the perfect one to suit your needs. I have also tutored children at Sylvan Learning Center and have helped non-native english speakers with their conversational skills. PRACTICAL EXPERIENCE: JANE OF ALL TRADES CLEANING AND ORGANIZING BOZEMAN, MT APRIL 2009-CURRENT OWNER •Began this business as a part time opportunity in conjunction with my full time position at the Gallatin County Re-Entry Program. The business was successful within six months and I was able to begin working full time, maintaining my clients’ needs as far as housecleaning and organizing •Maintain records in a neat and orderly fashion •Maintain a friendly relationship with each client and adhere to their individual preferences •Entrusted to do a job well done while maintaining confidentiality of home and/or office contents, clients’ personal belongings, and keys and/or security codes •Cleaned and organized for small businesses throughout Bozeman •Responsible for maintaining financial records, employment records, mileage, receipts, taxes, paperwork, and for handling phone calls and voicemails, appointments, and purchasing cleaning supplies. Also maintain company website and all advertising and promotions •Was asked to be in Who’s Who of Small Businesses in 2010 •Ran Seize the Deal promotion twice; advertising throughout Gallatin County •Participated in the 2010 “What Women Want to Know Expo” •Make homemade ‘green’ cleaners for clients’ usage SYLVAN LEARNING CENTER NOV 2009-FEB 2010 BOZEMAN, MT TUTOR •Passed Sylvan Learning Center’s entry test for tutors, followed by separate courses and online scored courses surveying each area of the Sylvan Learning Center’s goals and its expectations and instructions for becoming a tutor •Tutored in Middle School level math, High School level math, Reading, Spelling, students’ homework assignments, as well as SAT and PSAT tutoring. Also tutored in English and Literature and was exposed to a broad variety of students, backgrounds, and different levels of capability and instruction methods •Responsible for maintaining and documenting each student’s progress, making notations, encouraging the student, and ensuring they had a fun and valuable learning session GALLATIN COUNTY RE-ENTRY PROGRAM, CCCS INC. APRIL 2008-OCT 2009 BOZEMAN, MT RESIDENT CASE MANAGER/TLP CASE MANAGER/ G.E.D. FACILITATOR •Maintain caseload of 25-30 clients and meet with residents weekly to discuss and document each aspect of their life to include: criminal and chemical background, financial, emotional, physical, recreational, mental, and spiritual needs and progress •Prepare quarterly, progress, and terminal reports as well as treatment plans and parole reports •Experienced with Department of Corrections, Board of Pardons and Parole, and Probation and Parole policies, procedures, and paperwork/documentation, in addition to legal and court documents, and confidential medical/mental health information •Supervise Transitional Living Program (TLP) clients and progress •Supervise G.E.D. program and facilitate testing •Chosen as substitute for Aftercare group for a period of approximately eight weeks •Interact effectively with clients and staff in addition to maintaining relationships with clients’ employers, families, friends, mental health counselors, Probation and Parole officers, and other outside agencies to assist in retaining support system for transitioning client •Experienced in working with special needs offenders SHIFT LEADER/G.E.D. FACILITATOR AUG 2007-APRIL 2008 •Developed strong leadership and conflict resolution skills supervising up to five Resident Assistants as well as 40+ adult male offenders •Maintained safe and secure facility for residents, staff, and visitors •Assisted with updating and maintaining program policies and procedures •Rigorously maintained the confidentiality of legal, medical, and personal documents •Responsible for Material Safety Data Sheet (MSDS) audits, resident chore list, and ordering supplies for facility, as well as updating daily paperwork to insure accuracy •Provided cohesive work environment by delegating tasks to those on shift and communicating effectively, utilizing positive reinforcement and encouragement •Trained Resident Assistants who were new employees or new to the shift and provided employee evaluations •Facilitated G.E.D. prep and testing course RESIDENT ASSISTANT/G.E.D. FACILITATOR JULY 2006-AUG 2007 •Proficient in Breathalyzer Administration, Urinalyses, Pat Downs, Room searches, Physical Checks, approving community residences for visitation purposes, as well as transportation of residents to and from locations and dispensing medications •Developed and implemented G.E.D. Prep and Testing Course and taught Lifeskills course for a period of 30+ weeks MICHIGAN STATE UNIVERSITY (MSU) AUG 2005-OCT 2005 EAST LANSING, MI CRITICAL INCIDENT PROTOCOL CLERICAL ASSISTANT •Data entry of “Weapons of Mass Destruction” Seminar evaluations •Compiled materials necessary for nationwide training programs •Involved with updating the Critical Incident Protocol Program website REFUGEE SERVICES OF LANSING MAY 2003-AUG. 2003 LANSING, MI INTERN •Trained employees in HIPAA regulations and compliance •Mapped Emergency exits and assisted with emergency procedures and protocol •Assisted in assuring policy compliance in accordance with the Council on Accreditation INSTITUTE OF PUBLIC POLICY MAY 2003-AUG. 2003 AND SOCIAL RESEARCH (IPPSR) EAST LANSING, MI INTERN •Conducted research concerning how various programs at MSU utilized land grants for further development and research •Responsible for making contact with each department to discuss their mission and how they utilized land capacity to the fullest in accordance with grants bestowed upon them PRIME HOUSING GROUP MAY 2003-AUG.2003 EAST LANSING, MI RESIDENT MANAGER •Responsible for the oversight of 67 apartments •Maintained orderly appearance of apartment complex EDUCATION: MICHIGAN STATE UNIVERSITY—EAST LANSING, MI MASTER OF SCIENCE IN CRIMINAL JUSTICE MAY 2005 •Teaching Assistant for “Public and Private Partnerships for Emergency Preparedness” and Graduate Assistant for “Issues in Terrorism” graduate level courses MASTER OF PUBLIC POLICY AND ADMINISTRATION MAY 2004 •Assisted with the publication “An Analysis and Evaluation of the Effects of Legislative Term Limits in Michigan” for Capstone course by writing a portion of the document in addition to editing the entire final compilation BACHELOR OF ARTS IN FRENCH LANGUAGE AND LITERATURE DECEMBER 2001 •Participated in Michigan State University’s Study Abroad Program taking courses in Tours, France during summer sessions of 1998 and 1999 CERTIFICATIONS AND TRAINING: GALLATIN COUNTY RE-ENTRY PROGRAM JULY 2006-OCT 2009 •Certified in CPR, First Aid, Breathalyzer administration, Urinalysis testing (including federal clients), DNA swabbing, and fingerprinting. Received training on topics such as Standards of Conduct, Con Games, Team Building, Facilitator Training, Cultural Diversity, Identity Theft, Maintaining Confidentiality, Drug and Alcohol Addictions, as well as Mental Health Crisis Intervention techniques. Also received handcuff and self defense tactics training, in addition to defensive driving course MCGRAW HILL PUBLISHING CO. MARCH 2007 •Certified to administer TABE testing to those seeking to obtain a G.E.D. CERTIFICATIONS AND TRAINING: (continued) MICHIGAN STATE UNIVERSITY AUG 2005 •Earned Homeland Security Studies Certificate by participating in three tiered course program at Michigan State University with topics of “Issues in Terrorism”, “Foundations of Homeland Security”, and “Public and Private Partnerships for Emergency Preparedness” SKILLS AND SOFTWARE: •Self motivated, success driven, and ambitious •Consistently demonstrate sound judgment •Ability to resolve conflict •Communicate effectively both orally and written •Highly organized and detail oriented •Prompt and punctual •Deal effectively with others beyond giving and receiving instruction •Team Player •Well developed critical thinking skills •Experienced in the use of SPSS, STATA, ArcView, Adobe, Microsoft Word, Excel, and PowerPoint as well as Internet, E-mail and Social Networking sites REFERENCES AND WRITING SAMPLE(S): •Available Upon Request
Bozeman, Montana, United States
Patrick Bentz - Freelance Photo Editing & Graphic Design
3
Kudos
4.0
2 Skills
$10
Rate/Hr
I will edit any picture you would like to optimize it for whatever your need. I am experienced with Adobe Photoshop, and can take anything from a family picture or graduation picture to your old scanned pictures and make them look fantastic! I have also done work in graphic design, and am currently in college doing so. I can create a wide range of documents to serve any purpose.
Janesville, Wisconsin, United States
Joshua DeGolier - Freelance Website Programming & Graphic Design
0
Kudos
4.5
2 Skills
Ask
Rate/Hr
Joshua DeGolier Professional Experience Education July 2003 – Present Seagrove Village Market Café Santa Rosa Beach, FL Kitchen Manager Responsible for managing restaurant on evening shift, ordering and inventory control. October 1999 – March 2004 Diversions Entertainment Panama City Beach, FL Motion Capture Director Deciding and Capturing the animations from a motion capture studio for the PC Game One Must Fall: Battlegrounds. Sound Effects Director Making sound effects from raw data and sounds to go in conjunction with the fighters and arenas in the PC Game One Must Fall: Battlegrounds. August 2001 – October 2001 Big Web Systems Panama City Beach, FL Graphic Artist Creating layouts and graphical interfaces, buttons for web pages. September 1997 – May 2000 GCCC community paper “Gulls’ Cry” Panama City, FL Art Director Would create graphics from a description of an article or editorial set by the Editor. May 2008 - Present Walton Career Development Center Defuniak Springs, FL Web Development Learning the fundamentals of coding for web sites using various techniques of coding in different languages. -Currently have Web Development Certificates September 2000 – December 2000 Gulf Coast Community College Panama City, FL Computer Imaging 2 Compose original graphics using Corel Draw 8 with the elements of design and the philosophy of art. Finished the course at the top of my class with a perfect score. September 1999 – December 1999 Gulf Coast Community College Panama City, FL Micro Computers Learning computer basics and the fundamentals of Microsoft Windows NT and Microsoft office. I finished the course at the top of my class with a 100. Computer Imaging 1 Compose Graphics using Corel Draw 8 with the elements of design and the philosophy of art. Creation of art limited to instructors’ idea. Finished the course at the top of my class with a perfect score and succeeding to the next level. August 1993 – June 1997 A. Crawford Mosley High School Lynn Haven, FL High School Graduated with Florida High School diploma. Pascal Learning and using the fundamentals of the computer language. Skills -Team Member -Microsoft Windows 95, 98, 2000,2000 NT & XP, XP pro, Vista, Windows 7 -Microsoft Office & Office XP Pro -Adobe Photoshop 7 -Adobe Illustrator 9.0 -Corel Draw 7 & 8 -Discreet 3D Studio Max 3 -Discreet 3d Studio Max 6 -Macromedia Flash 5 -Cool Edit Pro -Acid Pro -HTML, XHTML, DXML, CSS2 -MySQL -PHP -Java -Javascript
Freeport, Florida, United States
Frank Olivier - Freelance Drafting & CAD
0
Kudos
5.0
2 Skills
$45
Rate/Hr
nr Mechanical, Structural Designer - Project Coordinator - Project Engineer • Professional offering over 24 years of experience ranging from Project Coordination to Design in Process Plants, Industrial Buildings and Mining • My Golden rule: To take the Imposable and meet the Project Design requirements keep it with in Schedule of the Process Plant Life Span, bring the Project Under Budget and meet all projects meets all OHS requirements. • On Site and Office Environment experience, working on Multi project and workloads and Proven ability to Cope with High Volume of Pressure. • Project Management and Proven skills in Result-Driven and Motivation and Team Leadership, with strong and Decisive Operations Leadership, Loyal and Professional, Ethical, Honest Excellent in Deceive Decision Making, Honest and Dependable. • Time Management, Planning and Scheduling of Workloads, Strong Communication and High Level of Problem Solving, Technical skills and Report Scope of works writing and Able to take on New Challenges. • A committed Team player, able to work as a Team member or on my own initiative with Minimum Supervision in a Office, Workshop Fabrication and Site Construction. • Pro-active, goal oriented with excellent attention to detail. Positive Attitude towards my Fellow works, Team focused, Problem Solving, Results and Objective Driven. • Commented to Organisation Providing Quality Service to Internal and External Clients and ongoing Personal skill and Development Training Program. • Drawing on my past Experance to Meet all Requirements to meet Technical Managemet and Drawing Office Procedures, the use of Project Standards and all required AS/NZ code for each discipline • Excellent customer focus and able to consistently meet client’s needs. • Effectively manages change to work tasks and the work environment, and assists others with adapting to change. • Able to identify issues, problems and opportunities; make timely decisions; develop appropriate and innovative solutions; and ask for assistance if required. • Excellent verbal and written communications skills, including the ability to convey information and ideas to individuals and groups, and make presentations when required. • Demonstrate initiative and a willingness to learn and continuously improve on performance. • Able to work effectively in small to large multi-disciplinary teams, and share and transfer knowledge within teams. • Creating work packs for large and small bore pipe; i.e. pipe supports, piping routes and required material take offs onsite or located in main office. The use of 3D models and P & ID’s and mechanical and structural steel layouts to complete a work packs. All piping routs are laid out to meet safe installation and keep cost down. Includes pipe spool length for safe installation. » Education Diploma of Business (Front Line Management) Associate Diploma in Civil Engineering Process Piping Design » Skills Applications Microsoft Project Professional Release 2013 Microsoft Office Professional all relevant software Microsoft Office SQL Server 2000 Database AutoCAD Release: Dos 12 to Win 2015 AutoCAD Advance Steel 2015 Autodesk MEP 2015 AutoCAD Revit Structure 2014 & 2015 AutoCAD Revit MEP 2014 & 2015 AutoCAD Navisworks 2009 to 2015 Auto plant 3D Piping series 5 & 6 Pro Cad Piping 2D /3D Smart 2010 Bentley Pro-Steel v8i select series 6 Bentley Auto Plant P & ID Auto Turn Release: 6.0 Micro Station v8i Bentley OpenPlant Modeler V8i » Work Experience Brightwater Engineering (Perth) Snr Mechanical Designer AutoCAD 2015, Navisworks Manage 2015 August 2014 - September 2014 Yarraville Slage Grinding Mill Project Contracted to bring the Project in Under Schedule and Under Cost with Good Engineering practice, 3D Design using AutoCAD and Navisworks to complete Design Reviews and Clash Detection. The design composed three sag mill feed chute feeding one conveyor. Two of the chute require chute to capture any steel fragments which will be picked up by two magnets. These to chute require to be directed away from the head chute to the recycle bins located on the floor level. Complete some miner back drafting 3D model was used to design check for clash detection and cut sections and elevation for detailing. All three chute composed of the same head chute and each discharge chute were design to meet the material flow rate on to the conveyor at a 9 degree angle. With Good Engineering practice and 3D design and Clash Detection the time spent kept the Project ahead of schedule. August 2013 - August 2014 Home renovations using AutoCAD and Navisworks software to complete a 3D models to complete design tiling, BBQ area and decking frame and decking boards, brick and carpentry work. Installation of two 5000l and 1100 l of rain water tanks and single water pump, which included the reticulation P & ID and piping layout including transfer pipework between main storage and operation tank, the design composed of using one pump to complete the following: use for reticulation and transfer of water. All designs included BIM for MTO take off to manage budgets and trade running (if required to complete any work) costing and shorten construction time down. Current working on the roof design to cover outdoor setting and BBQ area. All design meet required Drafting and Australian Standards and a complete set of design and construction drawings. June 2011 - August 2013 Ausenco Minerals & Metals Snr Mechanical Designer, Project Coordinator AutoCAD 2013, AutoCAD MEP 2013, Navisworks Manage 2013 & Pro- ProSteel June 2011 - June 2013 Kazakhmys Bozshakol Copper Project Working out of Perth to Project Coordinator Mumbai office taking a project which was at 30% complete and issuing it for 100% complete for construction over 16 months. Issue of drawing deliverables and tracing of all deliverables issued at different stages of the project, and tracking Hold Register, Vendor data. Running schedules on all drafting deliverables and man-hours on the design areas been worked on by the Mumbai Office. working with Multi disciplines on workloads, meeting schedules, budget hours and Strong Communication and High Level of Problem Solving, Computer Software followed the improving of Technical skills. Maintain a Positive Attitude into the working environment while working remotely, Keep the Team focused on the design, Problem Solving as problems come to hand. Planning, directing, coordinating and managing the activities design, personal groups assigned to small battery limits. Project coordination of multi-disciplinary project teams, and progress reporting. Reviewing engineering and design schedules, man-hour budgets and controls. Project meets technical documentation such as specifications, flow diagrams and plot plans. Monitoring multi-disciplinary designers progress on assigned project. Assuring compliance of engineering effort to project schedule, Weekly project update to company management and owners. Working alongside Perth and Mumbai designers on a Reclaim Tunnel design and Copper Concentrate load out building, to complete 3d models to extract 2d drawings. Working alongside Designers and Snr. Engineers to meet the schedule. Insuring that all design work meets required Project and Australian Standards, and meet budget requirements, Detail up drawings for elevations & section drawings, extraction fans inlet and outlet connection and conveyor systems layouts located under collectors and changing design by drawing up a and 3d model on the process system. The extraction of 2D layouts from the 3D models “HVAC, piping, mechanical equipment and air and electrical cable trays” for shop fabrication drawing and bill of materials. Inputs came from existing Engineering manual drawing and site sketches, and 3D modelling from clash detection software. The Checking of pipe supports, access platforms, stairs ladders and HVAC and all new conveyors, bins and cutes and managing progress drawings, which included piping, HVAC duct drawings, batch hoppers, material take offs and all project drawings for the release for construction. Using life 3d models plate work, steel work to generate 2d layouts, Plans, Sections and Elevations in Pro-Steel 2D section for design and vendor issue. This includes working with Mechanical and Pro-Steel Engineers to complete design and include changes. Using Navisworks to complete Design Reviews and clash detection for all disciplines and changing the design meets the project design and standards. The issue for match up images to design personal to incorporate design, clash detection or new vendor/suppler data. Reviewing of all Pro-Steel , piping mechanical design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s. Checking of work packages and marking up information and returning for update and issue under the current revision. Weekly update and drafting deliverables and progress reporting. Updating cad systems and supporting personal in the use of pro-steel. The use of Pro-Steel to give live design changes but plate work and steel MTO’s. Ausenco Mumbai – India Tucano Gold Mine Working out of Mumbai office taking a project which was at 15% complete and issuing it for 100% complete for construction over 6 months. Working with Perth and Mumbai designers, drafters and Snr. Engineers to meet the schedule. Weekly update and drafting deliverables and progress reporting. Checking of all Pro-Steel design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s and piping isometric’s. Using life 3d models plate work, steel work to create layout, sections elevations in Pro Pro-Steel Auto-plant to create life 2D section for design and vendor issue. Weekly update on Project Design and drafting deliverables and progress reporting Using of Naviswork 2013 for clash detection , design review and design progress and vendor data review. Updating cad systems and supporting personal in the use of Pro-Steel and Auto Plant. The use of Pro-Steel to give live design changes but plate work and steel MTO’s. Drawing on past Experance to help with Training Engineers and Draftsmen to meet Australia Standards and Document Control Procedures. Intrudes a Positive Attitude into the working environment, Maintain Team focused on the design, Problem Solving as problems come to hand. Planning, directing, coordinating and managing the activities design, personal groups assigned to small battery limits. Project coordination of multi-disciplinary project teams, and progress reporting. Reviewing engineering and design schedules, man-hour budgets and controls. Project meets technical documentation such as specifications, flow diagrams and plot plans. Monitoring multi-disciplinary designers progress on assigned project. Assuring compliance of engineering effort to project schedule, Weekly project update to company management and owners. Setting up the next process data transfer and design process to meet all project and design process to be issued to Ausenco Mumbai, Remote Office (Mumbai) experience back to Perth , working with Multi disciplines on workloads, meeting schedules, budget hours and Strong Communication and High Level of Problem Solving, Computer Software followed the improving of Technical skills Projects: Kazakhmys Bozshakol Copper Project (1.9 Billion) Bozshakol Clay Project study (120 million) Tucano Gold Mine (110 million) Matrix Composites & Engineering Snr Mechanical Draftsmen & Project Engineer AutoCAD 2009, AutoCAD MEP 2010, Navisworks Manage 2010, Pro-CAD 3D Smart & Pro-Steel May 2010 – May 2011 At Henderson feasibility Design layouts of piping systems stainless steel tube and Sch 80 pressure process systems and Pro-Steel platforms, and plant access , pipe systems and conveyor bridge linking to storage silo’s. Using of Navisworks for clash, design review and design progress for vendor data review and work progress complete. Responsible for preparing and reviewing, design drawings and other information. Supports construction and procurement with preparation of drawings and material take offs. Reviews drawings and assists with collection of design information required by construction and procurement. Incorporating engineering practices, design details, international codes and standards, procedures and specifications. Directly involved with development, enhancement and maintenance of 3D graphic visual display and modelling work. 3D modelling of new plant, detail pipe & tube layouts, isometrics a Pro-Steel drawings on elevations & section drawings, design 3d model on the high pressure process system. 3D Model layout on high pressure process and all steel work and high presses pipe and tube feed conveyor systems, and piping system covered oil and resin. Design layouts of process and Pro-Steel working platforms, pipe/conveyor Bridge. Checking of vender deign and drawings piping and tubing and Pro-Steel steel drawings, material take offs for construction. This includes checking P&ID’s, Plant layout, 3D modeling of the plant and Pipe work using 3D SMART Procad pipe. Using Prosteel to 3D Model all steel layouts to complete pipe & tube runs and tube feed conveyors. Using Naviswork 2010for design review and clash detection Overseeing the Fabrication and Installation and of all low pressure Tube system (900kPa) process room and high pressure piping (sch80 RTJ valves /flanges) system (1700kPa) piping in the main process building. Coordinating work packages and the writing up work area scope of work and review proposal packages. Fabrication of 8 off, 60 000liter storage tanks and installation. Writing up tender documents to the high and low pressure process and steel platforms, walk ways for fabrication. While meeting project schedules, and procure tube, valve and fittings. While under construction working with tube and high pressure pipe fitter and boiler makers. Following up on steel fabricator and equipment installers. Updating and meeting project schedule and completing work before schedule outlined. Any design changes met strict process to stay within piping P & ID’s with approval from process engineer and project manager. Responsible for scoping, planning, directing, coordinating and managing the activities design, site installation personal groups assigned to small battery limits. Estimating of piping, Pro-Steel and tanks to let contracts for fabrication, project coordination of multi-disciplinary project teams, and progress reporting. Developing a definition of the scope of engineering services to be provided by the company. Reviewing engineering and design schedules, man-hour budgets and controls. Approving all project technical documentation such as specifications, flow diagrams and plot plans. Monitoring engineering expenditures and progress on assigned project. Assuring compliance of engineering effort to project schedule, control estimates and company procedures. Weekly project update to company management and owners. Commissioning Engineer Overseeing construction process to meet client design and process design and that plant meet Australia standards from a construction, commission and maintenance while under production. Checking of all vendor data and checking all design data to all process data before any commissioning takes place. Checking and all pipe lines, fixing and confirming it meets the design process. Training site personal once the plant is commission has taken place after the first 100 hours. Project: New facility in Henderson ($ 32 Million) Tiwest Joint Venture Snr Mechanical Designer AutoCAD R 2009, AutoCAD MEP 2010, Navisworks Manage 2010 & Pro-Steel April 2009 – April 2010 On site Chandala for the design RI recovery operation and conveyor to replace of existing RI recovery hopper and conveyor. This included accessing existing building and road way and existing drainage. The design included mechanical layout front end loader access to 40t hopper and new conveyer. Updating of Process Flow Diagrams and Piping and Instrumentation Diagram, site plan update and generate a set of mechanical layout and section drawings to match design change. The design included Hopper design, concrete bunker and conveyor with tail and head chute feeding into 8” (203mm sch80) pipe work and isolation valves into a hot bin with bypass system to feed into conveyor system. Civil layout for conveyor and hopper drawing for foundations. Checking and red lining of design drawings for the following disciplines, Mechanical, Pro-Steel , Piping and civil Drawings for 23klt Activated Carbon Process and re-issuing back to EPCM. This included checking design of two existing Pro-Steel , pipe work and location of mechanical equipment’ i.e. conveyor head and trail chutes, Pro-Steel and piping levels’. Layout on a 54 meter long x 35meter wide Activated Carbon storage shed to access with B-trains and forklifts. Design included B-train turning circles and drainage to the building. At Kwinana feasibility study Design layouts of process to introduce Lime process to replace existing Limestone process in area 600. Tanks, pumps, hopper and conveyor. Updating Lime PFD & P &ID’s to include into lime stone into existing Lime process. Plant layout to include storage tanks, conveyor and low level feeder including pump layouts. Included in the design for front end loader, semi-trailer turning circles. Pro-Steel stairway, working platform and ladder access to tanks and actuators. Mechanical feed hopper, discharge chute and pipe layouts for pumps. Project: Kwinana Feasibility Project (Congo) (5.5 Million) Chandala RI Recovery ($ 25 Million) Ausenco Minerals & Metals Snr Mechanical Designer Draftsmen AutoCAD R 2008. October 2008 – November 2008 Design layout of process Tanks, pumps and CCd’s to match PFD process and size of equipment match data sheets. By producing plan, elevation and section drawings for design review for costing. Process plant layout for the following process areas Copper leach circuit, CCD thickeners, Reflux thickening and clarification, cobalt leaching circuit Sulphur dioxide absorption process. Checking of layouts on each battery limit to make sure all piping and Pro-Steel will be located in the right location once we move into detail design in the all areas. All drawing meet the required drawing office procedures to meet all required AS/NZ codes. Project: Mutanda Copper Project (Congo) ($ 1.1 Billion) Worley Parsons Hydrocodone’s Snr Piping Designer – AutoCAD R2005 – Auto Plant 3D Piping & Pro-Steel June 2008 – October 2008 3D modelling of current and future plant, detail pipe layouts, isometrics a Pro-Steel drawings on elevations & section drawings, design 3d model on the process system. Checking of drawings piping, Pro-Steel steel drawings, material take offs for construction. This includes checking P&ID’s , Plant layout, 3D modeling of the plant and Pipe work using Autoplant. Using Prosteel to locate existing and future steel layouts to complete pipe runs. Checking all pipe routing, Material take off and Item listings and all drawing meet the required drawing office procedures including all AS/NZ codes. On site checking piping routes and structral pipe supports, rack, including civil works for new designs. Project: BP refinery Kwinana ($ 11 Million) Bateman Engineering Lead Designer – AutoCAD R 2005 – Auto Plant 3D, Pro Pro-Steel . June 2007 – June 2008 Responsible for scoping, planning, directing, coordinating and managing the activities design, site installation personal groups assigned to small battery limits. Estimating of piping, Pro-Steel and tanks to let contracts for fabrication, project coordination of multi-disciplinary project teams, and progress reporting. Developing a definition of the scope of engineering services to be provided by the company. Reviewing engineering and design schedules, man-hour budgets and controls. Approving all project technical documentation such as specifications, flow diagrams and plot plans. Monitoring engineering expenditures and progress on assigned project. Assuring compliance of engineering effort to project schedule, control estimates and company procedures. P & ID, PFD & 3D model, detail pipe, civil & Pro-Steel drawings on details, elevations & section drawings, design 3d model on the process system. Working with alongside designers, drafters and Snr Engineers to meet the schedule. Weekly update and drafting deliverables and progress reporting. Using life 3d models plate work, steel work to create layout, sections elevations in Pro-Steel Auto-plant to create life 2D section for design and vendor issue. Checking of all Pro-Steel design i.e. conveyors, transfer station and piping system, pipe racks and foundations to support (concrete) checking of piping system to meet P&ID’s and piping isometric’s. Using of Navisworks for clash, design review and design progress and vendor data review. Managing all progress, included piping, Pro-Steel steel drawings, material take offs and all project civil drawings for the release for construction. This includes checking P&ID’s , Plant layout, 3D modeling of the plant and Pipe and ProSteel work using Autoplant pipe and prosteel. Checking all pipe routing and material spec’s, including all ProSteel steel plate (Prosteel) between crushing and grinding and overland convoyer to the leach pad . ProSteel for the pipe racks, CCD’s tanks pipe supports and access platforms and all drawing meet all drawing procedures and meet all required AS/NZ code on each discipline, stairs. Checking all Material take off’s and Item listings. On site civil works construction and design, checking of levels. Setting up of AutoCAD Menu systems Title blocks, plot styles. Including a adding a continuous improvement plan in maintain Cad systems, Auto plant and drawing office procedures to meet all required AS/NZ code on each discipline. Project: Muliashi Copper Project ZAB710 (Zambia) ($1.25 Billion) HPS Environmental Enerflex Lead Draftsmen – AutoCAD R 2005 - Micro Station V8 August 2006 – June 2007 Manage of drawings schedules for Design of water and clean & dirty air extraction system, drawings P & ID, Isometrics and PFD, detail pipe drawings on elevations & section drawings, extraction fans inlet and outlet connection and conveyor systems layouts located under collectors and changing design by drawing up a and 3d model on the process system. The extraction of 2D layouts from the 3D models “HVAC, piping, mechanical equipment and air and electrical cable trays” for shop fabrication drawing and bill of materials. Inputs came from existing Engineering manual drawing and site sketches, and 3D modelling from clash detection software. The Checking of pipe supports, access platforms, stairs ladders and HVAC and all new conveyors, bins and cutes and managing progress all HPS drawing office and contractor drawings, which included piping, steel duct, Pro-Steel drawings, batch hoppers, material take offs and all project drawings for the release for construction. Setting up of AutoCAD Menu systems Title blocks, plot styles. Including a adding a continuous improvement plan in maintain Cad systems and drawing office procedures to meet all required AS/NZ codes and disciplines. Project: Tom Price DCB upgrade ($ 1.5 Million) BHP Mining Area C ($ 12 Million) BHP Yandi Expansion Project ($ 10 Million) Wesfarmers Kleenheat Gas Drawing Office Supervisor/CADD Manager AutoCAD 12 - 2007 July 1995 – August 2006 Design of Major Storage Facility, Automotive gas (autogas), Industrial and Commercial LPG installations. A thorough Knowledge on the required AS/NZ codes for the Design of LPG / LNG gas installations and storage felicities and maintaining a high level of safety at all times in the design process. Participate in design reviews, advice on technical design and drafting issues and compliance requirements as appropriate. Working alone side and overseeing all designs drawings from sketches, notes, plans, piping specifications to produce accepted designs for best practice and company process. Checking of all site layouts, in piping and routs, structure supports, ladders, stairs and cylinder storage platforms including material take offs. For the all LPG /LNG installations “bulk storage, road transport, fuel stations and industrial installations around Australia. To make sure all Australia standards (AS/NZ code s) are met. 2D in piping and civil layouts and designs including transferring 2D design to a 3D modelling to review design, when required. Piping layouts on plot plans, process equipment, and piping systems including (pump sets, compressors, vaporizers, boilers, pressure regulators, and pressure vessels, unload and load facilities). Detail design on mechanical equipment, drawing up of P & ID’s and producing piping designs and layouts from P & ID’s, material takeoffs. Checking of drawing to meet all require to local Government and Australia standards to meet the installation and operation process. Setting up of AutoCAD Menu systems (drop down menu, tool bars, dynamic blocks) to include the following Autogas, Industrial, Commercial, Standard symbols, LPG & LNG facilities, LPG & LNG P & ID’s, 2D and 3D piping fittings, fire protection systems, Gas reticulation systems, Pressure vessel layouts, Title blocks, steel sections and details. All blocks – symbols to transfer data to a database to extract material list from drawings. Including a adding a continuous improvement plan in maintain Cad systems and drawing office procedures to meet all required code and disciplines. Implementation setting a Drawing and GIS registers and numbering system to work from an intranet system to record, view, AutoCAD, AutoCAD Volo View drawings, PDF Documents (Projects, Road Tanker Records and LPG and LNG facility Specifications and documents), including MapInfo Maps, Gas reticulation systems and analyst maps. Rolling out of using AutoCAD Volo View and MapInfo Pro viewer to view drawings and maps thorough out Australia. Implementation of AutoCAD Map and MapInfo GIS software for company gas reticulations systems and analyst maps. Setting up an operating system, procedures and standards to meet company procedures and compliance. Projects: Current Projects Nowra Gas Storage Facility – Nowra (N.S.W) ($ 1.25 Million) Proposed LNG Heavy Vehicle Refuelling ($ 1.75 Million) LPG Projects: 1994 – 2006 Project Manage office building maintains – Murdoch office (W.A) ($ 20 Thousand) Project Manage office building maintains – Myaree office (W.A) ($ 10 Thousand) Armidale Gas Storage Facility (Mott St) – Armidale (N.S.W) ($ 1.5 Million) Swan Hill Gas Storage Facility - (S.A) ($ 75 Thousand) Bulwer Island Gas Storage Facility - Pinkenba (QLD) ($ 3.5 Million) Darwin (Winnellie) Gas Storage Facility - (N.T) ($ 1.1 Million) Kwinana Gas Storage Facility - (S.A) ($ 75 Thousand) Bangladesh Gas Import Storage Facility - Port Mongla - Dhaka($ 35 Million) Bulls Brook Gas Storage Facility – Upper Swan (W.A) ($ 1.2 Million) Bulwer Island Gas Storage Facility - Pinkenba (QLD) ($ 1.1 Million) Adelaide Gas Storage Facility – Winfield (S.A) ($ 1.2 Million) LPG Road Tankers Redesign ($ 20 Thousand) LNG Projects: 2000 - 2007 Armidale Gas Storage Facility (Mott St) – Armidale (N.S.W) ($ 3.5 Million) LNG Road Tankers Design (LNG-101) ($ 50 Thousand) Sands Transport - (W.A) ($ 100 Thousand ) Mitchell Transport - (W.A) ($ 90 Thousand) Deer Park - (VIC) ($ 1.5 Million) Murray Goulburn - (VIC) ($ 1.2 Million) Connell Wagner P/L Contractor ProSteel Draftsmen – AutoCAD R 12 July 1994 – August 1994 As build drawings on foundation layouts, ProSteel steel walk way updates. Project: Coflexip Asia Pacific CMS Construction P/L Contractor Estimator (Civil) May 1994 – July 1994 Estimating from Engineering and Architectural which included drawings costs on concrete, formwork, man hours, etc. Projects: BHP: Cockatoo Island Iron Ore Project Alcoa: Substations and Switch rooms CSBP: Granulation plant T & Z Architects P/L Contractor Cad/Draftsmen – AutoCAD R 12 May 1994 Project: Submarine Trainee facility (Naval Base, W.A) Transfer of manual drawings into AutoCAD. Lenny’s Commercial Kitchens Estimator / Draftsmen September 1993 – April 1994 Estimating from Engineering and Architectural which included drawings costs on floor plans for Bars and Restaurants. Planning and tracking of projects implementing workload and project register, weekly progress reports, and multi project tasking. Material takeoffs and costing on stainless steel bench tops, Kitchens appliances, food display. Backpacking though Europe on Holiday April 1993 – September 1993 Main Roads Department Carlisle, Perth W.A Contractor Civil Draftsmen AutoCAD R 11 January 1992 – August 1992 As Builds on Industrial and Commercial crossovers and drainage details. Design and details construction drawings in 2D and 3D drawings of Compensation Basin on the Token freeway. Including all sections and detail. Following up on accidents reports for the Mitchell Freeway. Progress reports on the raster transfer of Kings Park to AutoCAD. Projects: Kings Park drawing transfer Token freeway Compensation Basin Hydrocarbon Recovery Techniques Piping Designer AutoCAD R 11 January 1992 – August 1992 Process Design layouts and pipe fabrication drawings including pipe supports on oil recover units. Piping design sketches, plans, specifications and suppler data. Design skid mounted pumps and heat exchanges to be transportation. Drawing up 3D modules on plant layout on equipment. Linde AG Piping Designer AutoCAD R 11 September 1991 – November 1992 Process Design piping layouts and pipe isometrics drawings including material take offs. Overseeing of piping design and detail drawings from sketches, notes, plans, designs, specifications and data. Drawing detail design from P & ID’s and producing piping layouts. Drawing up 3D module on stage 3 plant, Moss Gas layout and equipment. Pressure Vessel detail sections and design (pump sets, compressors, boilers and load facilities). Bill of material take offs on piping systems and ProSteel steel. Setting up of Drawing register and document control system. Projects: SASOL 3 Moss Gas (60) Fuel Tanks and Pressure Storage Spheres United Construction P/L Piping Designer April 1991 – August 1991 Pipe materials take offs for Stainless and Carbon piping isometrics for shop fabrication. Setting up of recording of weld heat numbers and running fabrication reports. Issuing of working and releasing materials for fabrication. Maintaining records on pipe spools/isometric design variations and the recover of pipe fittings. Including keeping up to date with all the required specifications and progress reports. Planning and tracking of work load and all material use on project, weekly progress reports. Projects: North West Shelf Stage 3 Tub Bridge Gas Field Development Pinjar Gas Turbine Station Stage 3 Phillips Engineering P/L Henderson W.A Estimator April 1988 – August 1991 Estimating from Engineering and Architectural which included drawings costs on process plants and mining sits. Material take offs on chutes, conveyers, tanks, ProSteel steel and piping. Monitoring of fabrication of components, welding procedures and checking of ProSteel . Projects: Ocean Shipyards (workshop extensions) Mineral Sands St Ives Gold Mine United Construction P/L Contractor Project Pipe Designer & Scheduler January 1987 – May 1988 Manual drafting on revised piping isometrics and document control on Post weld heat treatment (PWHT) including NDT records. Pipe materials take offs for Stainless and Carbon piping isometrics for shop fabrication. Setting up of recording of weld heat numbers and running fabrication reports. Issuing of working and releasing materials for fabrication. Maintaining records on pipe spools/isometric design variations and the recover of pipe fittings. Including keeping up to date with all the required specifications and progress reports. Onsite running of Gantt charts, planning and tracking of project weekly progress reports on multi projects. Projects: North West Shelf Stage 2 North West Shelf Stage 2 (Domgas) December 1986 - Emigrated to Australia » Interest Landscape Photographic, gardening, carpentry, Sailing.
Perth, Western Australia, Australia
Barbara Beck - Freelance Script Writing & Screenwriting
0
Kudos
4.5
2 Skills
Ask
Rate/Hr
SUMMARY: Screenwriter and Corporate Writer/Producer/Director with over twenty years experience producing effective, award winning videos, on time and on budget. EXPERIENCE: 1990 - Present: SCREENWRITER - Write feature length screenplays. * Sold the screenplay "Unfinished Business" to Drimtim Entertainment. Production pending. * Other screenplays have been optioned by Wonder Entertainment, Drimtim Entertainment, Carla Singer Productions and Citadel Entertainment. * Received Gold Award at the Houston International Film Festival in the Original Dramatic Screenplays Category for "Alone in the Dark". 1996 - 2003: VIDEO PRODUCTION SPECIALIST at NASA Ames Research Center, Moffett Field, CA As part of the NASA Ames Video Group, wrote, produced, directed and edited promotional and educational videos, public service announcements and video news releases on a variety of topics having to do with NASA, the Space Shuttle, space flight and various NASA technologies. 1988 - 1996: SENIOR COMMUNICATIONS SPECIALIST at TRW, Sunnyvale, CA Wrote, produced, directed and edited promotional, marketing, training and entertainment videos for corporate communications. EDUCATION: B.A., Cinema/Television, University of Southern California. AWARDS include: Silver Telly Award: Education Category Bronze Plaque Award: Science and Technology Category, Columbus Int'l Film & Video Festival. Gold Award: Worldfest Houston, Community Management Category San Jose Joey Award: Best Scripting. REFERENCES Available upon request.
Tucson, Arizona, United States
Edith Adjoke TRENOU-DACKEY - Freelance Proofreading & Editing
0
Kudos
5.0
2 Skills
Ask
Rate/Hr
Edith Adjokè TRENOU-DACKEY 2053 Northside Drive Atlanta, GA, 30305 Telephone : 404-694-3741 Email: edith.trenou@touareginc.com URL TOUAREG: www.touareginc.com SUMMARY OF QUALIFICATIONS • Twenty four years of extensive experience in translation, editing, proofreading, writing and conference interpreting for the medical, pharmaceutical, IT, Telecom, legal sectors. • Twenty years of experience in an executive and management capacity in communications, business development, project development and implementation, with a successful track record achieving company goals and positively affecting the bottom-line in diverse industrial settings. • Expertise in business development, communications, international negotiations, customer presentations, strategy development with an impact on product marketing, advertising, promotion and management in support of competitive positioning solutions. EDUCATION • Post-Graduate degree English/French in simultaneous conference interpretation, IPLV, Angers, 1992 • Post-graduate Degree in Translation and Interpretation from Georgetown University, Washington, D.C, 1989. • Training in Business Management, Georgetown University, Washington D.C, 1989. • M.A, in Communications and Languages, La Sorbonne, France, 1986 • Post-Bac degree in Writing from UC Berkeley University • Pre-Med Student at Emory University, Atlanta, GA, 2002 – current • MPH student at University of Florida Fluent in French, Italian, Portuguese, Mina, Ewe (West African dialects) EXPERIENCE From May 2003 to Current Touareg - Chief Executive Officer for the French and US entity of Touareg Localization and Translation Services Provider Editor for technical translations in the IT, Telecom, Financial, Legal, Pharmaceutical, Medical Simultaneous and Consecutive Interpreter, Editor and Writer Total responsibility ? To implement the strategic goals and objectives of the organization ? Enable the Board to fulfill its governance function ? Give direction and leadership toward the achievement of the organization’s philosophy, mission, strategy, goals and objectives. ? Overseeing HR, Marketing, Sales, Quality Management departments ? Perform regular missions of technical translation editing and simultaneous interpreting for clients in the new technologies, legal and medical fields. Moravia, Inc. Director Business Development – Interpreter April 2002 - to April 2003 Entire responsibilities for Business Development activities for the North American market. Reporting to President of Moravia, USA Company provided localization solutions and services to Fortune 2000, in the IT and Telecom sectors. ? Perform regular missions of technical translation editing and simultaneous interpreting for clients in the new technologies, legal and medical fields, as well as writing and editing. Bowne Global Solutions - Sr. International Business Development Director - Interpreter April 2001 to April 2002 Company - Provider of end-to-end Globalization Solutions to the world's leading organizations conducting Business internationally. * Perform regular missions of technical translation editing and simultaneous interpreting for clients in the new technologies, legal and medical fields as well as writing and editing. Lionbridge Technologies, Sr. International Business Development Director - Interpreter May 2000 - April 2001 Company - Provider of Multilingual Internet Services to the world's leading organizations that are conducting eBusiness in many languages. • In charge of global sales and strategic alliances for the eCommerce division of Lionbridge. • Responsible for Lionbridge's relationships with major Fortune 2000 clients worldwide, with a focus on e-Commerce. • Designed and implemented customized sales strategies. • Managed territory successfully. • Worked with operations to coordinate engagement execution. • Fully responsible for the growth and profitability of my dedicated accounts. * Perform regular missions of technical translation editing and simultaneous interpreting for clients in the new technologies, legal and medical fields as well as writing and editing. GLUE Communications/Xcelerate, New Business Development Director, Atlanta, GA, May 1999 to June 2000 Company - Communications Agency developing integrated marketing strategies for Fortune 500 companies. Merged in 2000 with Xcelerate - A full-service e-business solutions provider offering path from concept to implementation. • Total responsibility for developing and managing a wide range of sales prospects and establishing profitable relationships. • Total responsibility for planning, developing and managing marketing plans and programs in support of marketing and business development efforts. • In charge of defining Marketing Communications strategies for the Interactive Agency's image promotion. • Writer for the Agency ULTRAK INC., Product Coordination Director, Lewisville, Texas, March 1998 to February 1999. Company - A world leader in closed-circuit television, access control, facility management, communications and audio. • Total responsibility for coordination and liaison between product management and marketing communications in charge of all-related collateral scheduling and packaging. • Globally responsible for the overhaul of all translation, interpreting and documentation processes within the company, in charge of the entire reviewing and proofreading of spec sheets and manuals, as well as of all marketing collateral packages. • Total responsibility of international product marketing coordination. • Company interpreter (very technical subjects) THE WORLD INTERFACE, Executive Director, Grenoble, France and Plano, TX, from February 1992 to February 1998: Company - Business specialized in communications, management consultation, technical translation and interpretation. • Initiated and developed this start up business. • Total P & L responsibility for the planning, organization and start up of this business enterprise. • Record of success in the creation and implementation of innovative marketing concepts and strategies to introduce and promote this company and its amenities. • Developed and maintained an active client base spanning both Europe and the United States. • Recruited, trained and managed a staff of 16 communication, marketing and sales professional experts. • Created and marketed innovative concepts and services which resulted in successful company promotion. Responsibilities included translation and interpreting as well as project management. GRENOBLE ETUDES, Marketing Communications Manager, Grenoble, France, June 1991-January 1992 Company - European consulting firm specialized in the engineering, development and refinement of new technical products. • Developed and implemented successful strategies to market products and services while building strong associations with clients based on superior service quality. • Headed the Translation and Interpretation Division of the Consulting firm managing a team of 8 translators, 5 interpreters, reviewers, and editors. Free-lance Translator, Interpreter, Editor and Writer USA, Europe, 1987- 2005 for organizations such as EEC, UNESCO, The World Bank, The International Monetary Fund, ATT, CDC, Hewlett-Packard, EDS, Bristol-Myers Squibb, AstraZeneca, Biomérieux, Medrad, Medronic, WHO (World Health Organization) among others. Interpreter for the Mayor of Grenoble, France; the President of Kodak France; Major accomplishment - Excelled in the Art of technical translation , simultaneous interpretation from English, Italian into French and French into English, as well as editing and writing.
Atlanta, Georgia, United States
Alisha - Freelance Art & Drawing
0
Kudos
4.5
2 Skills
Ask
Rate/Hr
I crochet and knit all the time, I always want to learn new knitting tech- niques. I enjoy going to the cinema with my friends, I particularly love com- dey, horror and foreign films. I enjoy all kinds of music, quite frankly as long as the song has a good beat I’m happy. Right now I seem to have a bit of a fascination about Oscar Wilde. I am also a bit of a comic book nerd.
Leeds, Leeds, United Kingdom
Danaka Gordon - Freelance Animation, Illustration, Children's Book Illustration, Drawing, & Painting
41
Kudos
4.6
7 Skills
Ask
Rate/Hr
SOFTWARE: Adobe Photoshop, Illustrator, Premier Pro, After Effects, and Flash; Toon Boom Animate Pro and Toon Boom Harmony; Microsoft Office EXPERIENCE: “Parfum,” personal senior thesis film Responsible for all, September 2013 - March 2014 Exposition des Etudiants se SCAD Lacoste, Lacoste, Provence-Alpes-Cote D'Azur, France August 23-24, 2013 Facilitated and displayed animation and print work in an annual student exhibition “Asani,” senior thesis film by Rachel Schmieg Character Animator, January 2013 - March 2013 “The Fishmonger,” senior thesis film by Suzy Williams Character Animator, January 2013 - February 2013 EDUCATION: Savannah College of Art and Design, Savannah, GA Bachelor of Fine Arts in Animation, September 2010 – March 2014
Austin, Texas, United States